Construction Technology of Micro Bench Cut Method for Weak Rock Tunnel with High In-situ Stress

被引:0
作者
Zhiyong Chen
Zhongxun Wang
Guoshao Su
Song Gao
Xiaochuan Hu
机构
[1] China Railway 23rd Bureau Group Co Ltd,Key Laboratory of Disaster Prevention and Structural Safety of China Ministry of Education, School of Civil and Architecture Engineering
[2] Guangxi University,undefined
[3] The Civil Engineering Group Corporation of China Second Eingineering Bureau. Ltd,undefined
来源
Geotechnical and Geological Engineering | 2022年 / 40卷
关键词
Construction technology; Micro bench cut method; High in-situ stress; Weak surrounding rock; Tunnel engineering;
D O I
暂无
中图分类号
学科分类号
摘要
Taking Shanyang tunnel of Dali to Ruili (DaRui) railway as background, the construction technology of micro bench cut method for weak rock tunnel with high in-situ stress is established by combining the full-fgenius tunnelling method and bench cut method. For weak rock tunnel with large deformation, corresponding construction control points and technical characteristics are discussed. The following results are achieved. (1) The horizontal convergence deformation of Shanyang tunnel is larger than that of the subsidence displacement of the vault. Feet-lock bolt, reinforced grouting of arch foot surrounding rock, and expand support measures for arch foot are equipped to increase the stability and resistance of the supporting steel frame. (2) The narrow working surface of a single-line tunnel can be effectively utilized and the rapid construction of tunnel is also realized. (3) The construction technology can realize the rapid closure of the initial support into a ring, ensure the tunnel safety of the IV and V grade surrounding rock, reduce the construction cost, and improve the construction efficiency. The construction methods and techniques proposed in the article can provide reference for similar projects.
引用
收藏
页码:1407 / 1415
页数:8
相关论文
共 24 条
[21]   Theoretical analysis of the scattering characteristics of blasting stress waves at an arc-shaped interface crack in a deep rock mass with high in-situ stress [J].
Guo, Xiao ;
Ding, Chenxi ;
Wei, Peijun ;
Yang, Renshu ;
Yang, Haibin .
ENGINEERING FRACTURE MECHANICS, 2024, 307
[22]   Hinged design for resisting shear displacement of a deep-buried tunnel crossing an active fault under high in-situ stress conditions [J].
Jia-Wei, Zhang ;
Zhen, Cui ;
Xiang-Yu, Zhang ;
Jun, Cao .
ROCK AND SOIL MECHANICS, 2024, 45 (11) :3333-3344
[23]   Experimental study on the effect of flexible joints of a deep-buried tunnel across an active fault under high in-situ stress conditions [J].
Zhang, Jiawei ;
Cui, Zhen ;
Sheng, Qian ;
Zhao, Wanhua ;
Song, Liang .
UNDERGROUND SPACE, 2024, 19 :189-207
[24]   Intelligent back analysis of rock mass creep parameters for large underground caverns under high in-situ stress based on incremental displacement [J].
Chen J. ;
Jiang Q. ;
Feng X. ;
Hu Y. .
Meitan Xuebao/Journal of the China Coal Society, 2019, 44 (05) :1446-1455