共 108 条
[1]
Alcaraz J(2003)Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms J Oper Res Soc 54 614-626
[2]
Maroto C(1980)A formal set of algorithms for project scheduling with critical path method material requirements planning J Oper Manag 1 57-67
[3]
Ruiz R(2002)How to distribute costs associated with a delayed project Ann Oper Res 109 159-174
[4]
Aquilano NJ(1993)Heuristics for scheduling projects with resource restrictions and several resource-duration modes Int J Prod Res 31 2547-2558
[5]
Smith DE(1996)A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes Euro J Oper Res 90 349-361
[6]
Bergantinos G(2002)Two approaches to the problem of sharing delay costs in joint projects Ann Oper Res 109 359-374
[7]
Sanchez E(2007)A project game for PERT networks Oper Res Lett 35 791-798
[8]
Boctor FF(2008)A polynomial rule for the problem of sharing delay costs in PERT networks Comp Oper Res 35 2376-2387
[9]
Boctor FF(1987)An optimal algorithm for the quantity discount problem J Oper Manag 7 165-177
[10]
Branzei R(2011)Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers Euro J Oper Res 213 73-82