Optimum Criss Crossing Cables in Multi-span Cable-stayed Bridges using Genetic Algorithms

被引:0
|
作者
Hiram Arellano
Dante Tolentino
Roberto Gómez
机构
[1] Universidad Nacional Autónoma de México,Institute of Engineering
[2] Instituto Politécnico Nacional,Sección de Estudios de Posgrado e Investigación, ESIA Zacatenco
来源
关键词
alternate live loads; criss-cross cables; genetic algorithm; multi-objective optimization; multi-span cable-stayed bridges;
D O I
暂无
中图分类号
学科分类号
摘要
A multi-objective optimization approach in order to find the optimal cable overlap length in multi-span cable-stayed bridges with criss-cross cables is presented. The multi-objective optimization is solved by considering three objectives: 1) the cost of the cable system, 2) the displacement at the top of the pylon and 3) the alternate live load on the bridge. An unconventional criss-cross cable system configuration in which cables criss-cross at the center of intermediate spans is used for a bridge with five spans and four pylons. Taking into account both the cable overlap length and the different occurrences of alternate live load, the set of optimal solutions was obtained by the use of genetic algorithms. Results indicate that the optimal cable overlap length corresponds to three criss-crossing cables that corresponds to 0.28 times the length of the central span. Research on multi-span cable-stayed bridges with criss-cross cables allows the analysis of another solution for the problem of stabilizing the displacement of intermediate pylons in this kind of bridge.
引用
收藏
页码:719 / 728
页数:9
相关论文
共 50 条
  • [41] Experimental Study of Vibration Characteristics of FRP Cables for Long-Span Cable-Stayed Bridges
    Yang, Yaqiang
    Wang, Xin
    Wu, Zhishen
    JOURNAL OF BRIDGE ENGINEERING, 2015, 20 (04)
  • [42] Study on the safety assessment method for stay cables of long-span cable-stayed bridges
    Tianjin University, Tianjin 300072, China
    不详
    Tumu Gongcheng Xuebao, 2006, 9 (74-79):
  • [43] Influence of structural system measures on the dynamic characteristics of a multi-span cable-stayed bridge
    Geng, Fangfang
    Ding, Youliang
    Xie, Hongen
    Song, Jianyong
    Li, Wanheng
    STRUCTURAL ENGINEERING AND MECHANICS, 2014, 52 (01) : 51 - 73
  • [44] Optimum seismic design of curved cable-stayed bridges
    Ferreira, F.
    Simoes, L.
    STRUCTURES, 2022, 43 : 131 - 148
  • [45] Wind-induced vibration of cables of cable-stayed bridges
    Matsumoto, M
    Daito, Y
    Kanamura, T
    Shigemura, Y
    Sakuma, S
    Ishizaki, H
    JOURNAL OF WIND ENGINEERING AND INDUSTRIAL AERODYNAMICS, 1998, 74-6 : 1015 - 1027
  • [46] Developing a climbing robot for repairing cables of cable-stayed bridges
    Xu, Fengyu
    Dai, Suya
    Jiang, Quansheng
    Wang, Xingsong
    AUTOMATION IN CONSTRUCTION, 2021, 129
  • [47] Cable-stayed bridges with CFRP and steel composite stay cables
    Xiong, Wen
    Xiao, Ru-Cheng
    Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 2011, 43 (04): : 120 - 125
  • [48] Coupled vibration of cable-stayed bridges considering cables' interaction
    Liang D.
    Kang J.
    Zhao W.
    Liu J.
    1600, Chinese Vibration Engineering Society (39): : 125 - 131and147
  • [49] Analysis of the Factors Contributing to Fatigue in the Cables of Cable-Stayed Bridges
    Astiz, Miguel A.
    HORMIGON Y ACERO, 2021, 72 (294): : 177 - 194
  • [50] OPTIMUM CABLE-FORCE ADJUSTMENTS IN CONCRETE CABLE-STAYED BRIDGES
    KASUGA, A
    ARAI, H
    BREEN, JE
    FURUKAWA, K
    JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1995, 121 (04): : 685 - 694