共 14 条
- [1] Caskey G., Hari Y., Hocken R., Palanivelu D., Raja J., Wilson R., Chen K., Yang J., Sampling techniques for coordinate measuring machine, Design and Manufacturing Systems Conference, pp. 779-786, (1990)
- [2] Chang T.C., Wysk R.A., An Introduction to Process Planning Systems, (1985)
- [3] Cho M.W., Kim K., New inspec tion planning strategy for sculptured surfaces using coordinate measuring machine, International Journal of Production Research, 33, 2, pp. 427-444, (1995)
- [4] Cho M.W., Seo T.I., Inspection planning strategy for the on-machine measurement process based on CAD/CAM/CAI integration concept, The International Journal of Advanced Manufacturing Technology, 19, pp. 607-617, (2002)
- [5] Cho M.W., Seo T.I., Kim J.D., Kwon O.Y., Reverse engineering of compound surfaces using boundary detection method, KSME International Journal, 14, 10, pp. 1104-1113, (2000)
- [6] Descotte Y., Latombe J.C., GARI: An Expert System for Process Planning, pp. 329-345, (1984)
- [7] Lee G., Mou J., Shen Y., Sampling strategy design for dimensional measurement of geometric features using coordinate measuring machine, International Journal of Machine Tools and Manufacturing, 37, 7, pp. 917-934, (1997)
- [8] Lee J.W., Kim M.K., Kim K., Optimal probe path generation and new guide point selection methods, Engineering Applica Tion of Artificial Intelligence, 7, 4, pp. 439-445, (1994)
- [9] Lee K.I., Lee H., Noh S.D., Shim Y.B., Cho H.S., A process planning system using group technology and rule-base, IE Interfaces, Korean Institute of Industrial Engineers, 8, 3, pp. 221-230, (1995)
- [10] Menq C.H., Yau H.T., Lai G.Y., Miller R.A., Statistical evaluation of form tolerances using discrete measurement data, ASME Winter Annual Meeting, 47, pp. 135-149, (1990)