Evaluation and prediction of time overruns in Jordanian construction projects using coral reefs optimization and deep learning methods

被引:0
作者
Shihadeh J. [1 ]
Al-Shaibie G. [2 ]
Bisharah M. [3 ]
Alshami D. [2 ]
Alkhadrawi S. [4 ]
Al-Bdour H. [5 ]
机构
[1] Architecture Engineering, College of Engineering, University of Baghdad, Baghdad
[2] Department of Civil Engineering, University of Jordan, Amman
[3] Department of Civil Engineering, University Putra Malaysia, Selangor, Serdang
[4] Civil Engineering, Water and Environmental Engineering Department, Al-Balqa Applied University, Huson College, Huson
[5] Master of Engineering Project Management, Faculty of Engineering, Jadara University, Irbid
关键词
Construction project management; Coral reefs optimization algorithm (CROA); Jordanian construction projects; Multi-layer perceptron (MLP); Predictive modeling; Time overruns;
D O I
10.1007/s42107-023-00936-3
中图分类号
学科分类号
摘要
Within the complex domain of construction project management, the accurate anticipation of time overruns is a significant obstacle, particularly within the specific context of the construction sector in Jordan. This study aimed to utilize deep learning, specifically the Multi-Layer Perceptron (MLP), and enhance its overrun predictive ability by incorporating the Coral Reefs Optimization Algorithm (CROA). The approach employed in our study involved the utilization of a comprehensive dataset encompassing diverse aspects of building projects, ranging from financial indicators to project durations. The Multilayer Perceptron (MLP) was utilized as the underlying framework, and the model's parameters were refined utilizing the Covariance Matrix Adaptation Evolution Strategy (CMA-ES) with Rank-One Adaptation (CROA) to enhance the predictive capabilities. The results of our study indicate that the MLP-CROA continuously showed superior performance compared to the standalone MLP across many metrics. Notably, the MLP-CROA had particularly excellent values in metrics such as R-squared, which suggests its solid predictive capabilities. In conclusion, this study highlights the significant potential for transformation in the Jordanian construction industry by integrating deep learning and bio-inspired optimization methodologies. This process improves forecast accuracy and facilitates proactive project management, potentially directing projects toward timely and cost-effective completion. © The Author(s), under exclusive licence to Springer Nature Switzerland AG 2024.
引用
收藏
页码:2665 / 2677
页数:12
相关论文
共 32 条
[1]  
Akinosho T.D., Oyedele L.O., Bilal M., Ajayi A.O., Delgado M.D., Akinade O.O., Ahmed A.A., Deep learning in the construction industry: A review of present status and future innovations, Journal of Building Engineering, 32, (2020)
[2]  
Ali K., Amir E., Mahdi M., Buckling resistance prediction of high-strength steel columns using metaheuristic-trained artificial neural networks, Structures, 56, C, (2023)
[3]  
Arabiat A., Al-Bdour H., Bisharah M., Predicting the construction projects time and cost overruns using K-nearest neighbor and Artificial Neural Network: A case study from Jordan, Asian Journal of Civil Engineering, 24, 7, pp. 2405-2414, (2023)
[4]  
Ashtari M.A., Ansari R., Hassannayebi E., Jeong J., Cost Overrun Risk assessment and prediction in construction projects: A Bayesian network classifier approach, Buildings, 12, 10, (2022)
[5]  
Bin Seddeeq A., Assaf S., Abdallah A., Hassanain M.A., Time and cost overrun in the Saudi Arabian oil and gas construction industry, Buildings, 9, 2, (2019)
[6]  
Eltoukhy M., Nassar A., Using support vector machine (SVM) for time and cost overrun analysis in construction projects in Egypt, International Journal of Civil Engineering and Technology (IJCIET), (2021)
[7]  
Gharaibeh L.G., Matarneh S.T., Arafeh M., Sweis G., Factors leading to design changes in Jordanian Construction Projects, International Journal of Productivity and Performance Management, 70, 4, pp. 893-915, (2020)
[8]  
Ghazali F., Wong H., Risk ranking for tunnelling construction projects in malaysia, Journal of Construction Engineering and Project Management, 4, 1, pp. 29-36, (2014)
[9]  
Gomez-Cabrera A., Gutierrez-Bucheli L., Munoz S., Causes of time and cost overruns in construction projects: A scoping review, International Journal of Construction Management, (2023)
[10]  
Gomez-Cabrera A., Salazar L.A., Ponz-Tienda J.L., Alarcon L.F., Lean tools proposal to mitigate delays and cost overruns in construction projects, In Proceedings of the 28Th Annual Conference of the International Group for Lean Construction (IGLC)., (2020)