Reentrant two-stage multiprocessor flow shop scheduling with due windows

被引:2
|
作者
Rong-Hwa Huang
Shun-Chi Yu
Chen-Wei Kuo
机构
[1] Fu Jen Catholic University,Department of Business Administration
[2] Fu Jen Catholic University,Graduate School of Business Administration
[3] Fu Jen Catholic University,Graduate Institute of Management
来源
The International Journal of Advanced Manufacturing Technology | 2014年 / 71卷
关键词
Reentrant; Multiprocessor flow shop; Ant colony optimization; Due windows; Farness particle swarm optimization;
D O I
暂无
中图分类号
学科分类号
摘要
Reentrant flow shop scheduling allows a job to revisit a particular machine several times. The topic has received considerable interest in recent years; with related studies demonstrating that particle swarm algorithm (PSO) is an effective and efficient means of solving scheduling problems. By selecting a wafer testing process with the due window problem as a case study, this study develops a farness particle swarm optimization algorithm (FPSO) to solve reentrant two-stage multiprocessor flow shop scheduling problems in order to minimize earliness and tardiness. Computational results indicate that either small- or large-scale problems are involved in which FPSO outperforms PSO and ant colony optimization with respect to effectiveness and robustness. Importantly, this study demonstrates that FPSO can solve such a complex scheduling problem efficiently.
引用
收藏
页码:1263 / 1276
页数:13
相关论文
共 30 条
  • [22] Relocation Scheduling in a Two-Machine Flow Shop with Resource Recycling Operations
    Lo, Ting-Chun
    Lin, Bertrand M. T.
    MATHEMATICS, 2021, 9 (13)
  • [23] A two-stage scheduling method for deadline-constrained task in cloud computing
    Xiaojian He
    Junmin Shen
    Fagui Liu
    Bin Wang
    Guoxiang Zhong
    Jun Jiang
    Cluster Computing, 2022, 25 : 3265 - 3281
  • [24] A two-stage scheduling method for deadline-constrained task in cloud computing
    He, Xiaojian
    Shen, Junmin
    Liu, Fagui
    Wang, Bin
    Zhong, Guoxiang
    Jiang, Jun
    CLUSTER COMPUTING-THE JOURNAL OF NETWORKS SOFTWARE TOOLS AND APPLICATIONS, 2022, 25 (05): : 3265 - 3281
  • [25] Flexible job shop scheduling with due window a two-pheromone ant colony approach
    Huang, Rong-Hwa
    Yang, Chang-Lin
    Cheng, Wei-Che
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 141 (02) : 685 - 697
  • [26] A fully polynomial time approximation scheme for scheduling on parallel identical two-stage openshops
    Dong, Jianming
    Jin, Ruyan
    Hu, Jueliang
    Lin, Guohui
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2019, 37 (02) : 668 - 684
  • [27] Two-stage algorithm for resource-constrained multi-project scheduling problem
    Chen J.-J.
    Tong S.-R.
    Ye Z.-G.
    Zhang J.-W.
    Wang Y.
    Nie Y.-F.
    Zhang Y.-Q.
    Chen, Jun-Jie (junjiechen75@nwpu.edu.cn), 2013, Northeast University (35): : 2013 - 2020
  • [28] Optimization of two-stage location-routing-inventory problem with time-windows in food distribution network
    Chen Chao
    Tian Zhihui
    Yao Baozhen
    ANNALS OF OPERATIONS RESEARCH, 2019, 273 (1-2) : 111 - 134
  • [29] Two meta-heuristic algorithms for flexible flow shop scheduling problem with robotic transportation and release time
    Zabihzadeh, Seyedeh Sarah
    Rezaeian, Javad
    APPLIED SOFT COMPUTING, 2016, 40 : 319 - 330
  • [30] A Two-Stage Algorithm Based on 12 Priority Rules for the Stochastic Distributed Resource-Constrained Multi-Project Scheduling Problem With Multi-Skilled Staff
    Yu, Yining
    Xu, Zhe
    Zhao, Song
    IEEE ACCESS, 2023, 11 : 29554 - 29565