The multi-period home healthcare routing and scheduling problem with electric vehicles

被引:0
作者
Osman Atilla Yazır
Çağrı Koç
Eda Yücel
机构
[1] Social Sciences University of Ankara,Department of Business Administration
[2] TOBB University of Economics and Technology,Department of Industrial Engineering
来源
OR Spectrum | 2023年 / 45卷
关键词
Home healthcare routing; Electric vehicles; Multi-period; Adaptive large neighborhood search;
D O I
暂无
中图分类号
学科分类号
摘要
This paper studies the multi-period home healthcare routing and scheduling problem with homogeneous electric vehicles and time windows. The problem aims to construct the weekly routes of healthcare nurses, which provide service to the patients located at a scattered geographic area. Some patients may require to be visited more than once in the same workday and/or in the same workweek. We consider three charging technologies; normal, fast, and super-fast. The vehicles might be charged during the working day at a charging station or at the end of the working day at the depot. Charging a vehicle at a depot at the end of a working day requires the transfer of the corresponding nurse from the depot to her/his home. The objective is to minimize the total cost that comprises the fixed cost of utilizing healthcare nurses, the energy charging costs, the costs associated with depot-to-nurse home transfer services, and the costs of a patient left unserved. We formulate a mathematical model and develop an adaptive large neighborhood search metaheuristic that has been efficiently crafted to handle specific problem features. We conduct extensive computational experiments on benchmark instances to assess the competitiveness of the heuristic and to deeply analyze the problem. Our analysis shows the importance of competency level matching as mismatching competency levels could increase the costs of home healthcare providers.
引用
收藏
页码:853 / 901
页数:48
相关论文
共 123 条
[1]  
Bard JF(2013)Weekly scheduling models for traveling therapists Socio-Econom Plann Sci 47 191-204
[2]  
Shao Y(2014)A sequential GRASP for the therapist routing and scheduling problem J Schedul 17 109-133
[3]  
Wang H(2014)The traveling therapist scheduling problem IIE Trans 46 683-706
[4]  
Bard JF(2012)A network-based approach to the multi-activity combined timetabling and crew scheduling problem: workforce scheduling for public health policy implementation Comput Indust Eng 63 802-812
[5]  
Shao Y(2019)Energy consumption estimation integrated into the electric vehicle routing problem Transport Res Part D 69 141-167
[6]  
Jarrah AI(1997)An integrated spatial DSS for scheduling and routing home-health-care nurses Interfaces 27 35-48
[7]  
Bard JF(2019)The role of operational research in green freight transportation Europ J Operat Res 274 807-823
[8]  
Shao Y(2015)Continuity of care in community midwifery Health Care Manag Sci 18 195-204
[9]  
Qi X(2017)A three-phase matheuristic for the time-effective electric vehicle routing problem with partial recharges Electron Notes Discr Math 58 95-102
[10]  
Jarrah AI(2015)Joint assignment, scheduling, and routing models to home care optimization: a pattern-based approach Transport Sci 49 830-852