Considering environmental costs of copper production in cut-off grades optimization

被引:0
作者
Esmaeil Rahimi
Kazem Oraee
Zia Aldin Shafahi Tonkaboni
Hasan Ghasemzadeh
机构
[1] Islamic Azad University,Department of Mining Engineering, Science and Research Branch
[2] Stirling University,Mining Engineering Department
[3] University of Tehran,undefined
[4] K.N. Toosi University of Technology,undefined
来源
Arabian Journal of Geosciences | 2015年 / 8卷
关键词
Hydrometallurgical methods; Environmental impacts; Leaching; Concentration; Cut-off grades; NPV maximization;
D O I
暂无
中图分类号
学科分类号
摘要
The average grades of copper mines are dropped by extracting high-grade copper ores. This matter has drawn considerations to processing methods which not only extracts low-grade copper ores but also decreases adverse environmental impacts. Hydrometallurgical methods are the most applicable ones which affect the optimum policy of cut-off grades determination. In this research, an optimum cut-off grades modeling is developed with the objective function of net present value (NPV) maximization. The costs of processing methods and associated environmental costs are also involved in the model. Next, limiting and balancing cut-off grades of processing methods are calculated through Lagrange multiplier optimization method. Finally, an iteration algorithm is exercised to compute the maximum amount of NPV as well as concentration and leaching optimum cut-off grades. The results show that the concentration and leaching optimum cut-off grades policy makes an improvement on overall NPV by 35 % in comparison with the traditional approaches of cut-off grades determination. The adverse environmental impacts of low-grade ores dumping are also reduced by using hydrometallurgical methods.
引用
收藏
页码:7109 / 7123
页数:14
相关论文
共 58 条
  • [1] Al-Hobaib A(2012)Environmental impact assessment inside and around Mahd Adh Dhahab gold mine, Saudi Arabia Arab J Geosci 5 985-997
  • [2] Al-Jaseem K(2007)Optimum cut-off grade policy for open pit mining operations through net present value algorithm considering metal price and cost escalation Int J Comput Aided Eng Softw 24 723-736
  • [3] Baioumy H(2013)A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams Resour Policy 38 591-597
  • [4] Ahmed A(2011)Net present value maximization model for optimum cut-off grade policy of open pit mining operations J South Afr Inst Min Metall 111 741-750
  • [5] Asad M(2003)Methods for calculation of optimal cutoff grade in complex ore deposits J Min Sci 39 499-507
  • [6] Asad M(2007)Determination of optimal cut-off grade policy to optimize NPV using a new approach with optimization factor J South Afr Inst Min Metall 107 87-94
  • [7] Dimitrakopoulos R(2001)Present and future commercial applications of biohydrometallurgy Hydrometallurgy 59 233-239
  • [8] Asad M(2008)Determination of the optimum cutoff grade considering environmental cost J Int Environ Appl Sci 3 186-194
  • [9] Topal E(2012)Assessment of hazardous mine waste transport in west central Sinai, using remote sensing and GIS approaches: a case study of Um Bogma area, Egypt Arab J Geosci 5 407-420
  • [10] Ataei M(2012)Cut-off grade optimization for maximizing the output rate Int J Min Geo Eng (IJMGE) 46 51-56