共 39 条
[1]
Dessouky M M(1998)Flow shop scheduling with identical jobs and uniform parallel machines European J Oper Res 109 620-631
[2]
Dessouky M I(1976)Open shop scheduling to minimize finish time J ACM 23 665-679
[3]
Verma S K(1996)Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hard European J Oper Res 89 172-175
[4]
Gonzales T(1998)A two-stage hybrid flow shop with uniform machines and setup times Math Comput Modelling 27 27-45
[5]
Sahni S(1954)Optimal two- and three-machine production schedules with setup times included Naval Res Logist 1 61-68
[6]
Hoogeveen J(1997)A comparison of sequencing rules in static and dynamic hybrid flow systems Internat J Production Res 35 1359-1384
[7]
Lenstra J(1997)A note on scheduling hybrid flow systems Internat J Prod Res 35 1491-1494
[8]
Veltman B(2006)A note on makespan minimization in two-stage flexible flow shops with uniform machines European J Oper Res 175 1321-1327
[9]
Huang W(1994)Minimizing makespan in hybrid flowshops Oper Res Lett 16 149-158
[10]
Li S(1999)Hybrid flow shop scheduling: A survey Comput Ind Eng 37 57-61