Integrated batch sizing and scheduling on a single machine

被引:0
作者
Philippe Chrétienne
Öncü Hazır
Safia Kedad-Sidhoum
机构
[1] Université Pierre et Marie Curie,LIP6
来源
Journal of Scheduling | 2011年 / 14卷
关键词
Batch sizing; Scheduling; Setup cost; Tardiness; Single machine; Dynamic programming;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, we address the integrated batch sizing and scheduling problem. We consider a single machine which can handle at most one customer order at a time and for which the nominal production rate is the same for all the customer orders. Demand is deterministic, and all the orders are ready to be processed at time zero and must be delivered at a given due date. Each order can be satisfied from different batches. Upper and lower bounds on the size of the batches are considered. We seek a feasible schedule that minimizes the sum of the tardiness costs and the setup costs incurred by creating a new batch. We present some structural properties of the optimal schedules for both single-order and multiple-order problems and then propose dynamic programming algorithms based on these properties. Computational results that show the efficiency of the method are reported.
引用
收藏
页码:541 / 555
页数:14
相关论文
共 32 条
[1]  
Albers S.(1993)The complexity of one-machine batching problems Discrete Applied Mathematics 47 87-107
[2]  
Brucker P.(2008)A survey of scheduling problems with setup times or costs European Journal of Operational Research 187 985-1032
[3]  
Allahverdi A.(1997)Scheduling job families about an unrestricted common due date on a single machine International Journal of Production Research 35 1321-1330
[4]  
Ng C. T.(2000)Batching identical jobs Mathematical Methods of Operations Research 52 355-367
[5]  
Cheng T. C. E.(2001)Single machine batch scheduling with sequential processing IIE Transactions 33 413-420
[6]  
Kovalyov M. Y.(1990)Batch sizing and job sequencing on a single machine Annals of Operation Research 26 135-147
[7]  
Azizoglu M.(2002)An iterated dynasearch algorithm for the single-machine weighted tardiness problem INFORMS Journal on Computing 14 52-67
[8]  
Webster S.(2003)Supply chain scheduling: batching and delivery Operations Research 51 566-584
[9]  
Baptiste P.(2005)The coordination of scheduling and batch deliveries Annals of Operation Research 135 41-64
[10]  
Cheng T. C. E.(2000)Scheduling with batching: a review European Journal of Operational Research 120 228-249