On component commonality for periodic review assemble-to-order systems

被引:0
|
作者
Antoine Deza
Kai Huang
Hongfeng Liang
Xiao Jiao Wang
机构
[1] McMaster University,Advanced Optimization Laboratory, Department of Computing and Software
[2] McMaster University,DeGroote School of Business
来源
Annals of Operations Research | 2018年 / 265卷
关键词
Assemble-to-order; Component commonality; Stochastic programming; Inventory replenishment; Component allocation;
D O I
暂无
中图分类号
学科分类号
摘要
Akçay and Xu (Manag Sci 50(1):99–116, 2004) studied a periodic review assemble-to-order (ATO) system with an independent base stock policy and a first-come-first-served allocation rule, where the base stock levels and the component allocation are optimized jointly. The formulation is non-convex and, thus theoretically and computationally challenging. In their computational experiments, Akçay and Xu (Manag Sci 50(1):99–116, 2004) modified the right hand side of the inventory availability constraints by substituting linear functions for piece-wise linear ones. This modification may have a significant impact for low budget levels. The optimal solutions obtained via the original formulation; that is, without the modification, include zero base stock levels for some components and indicate consequently a bias against component commonality. We study the impact of component commonality on ATO systems. We show that lowering component commonality may yield a higher type-II service level. The lower degree of component commonality is achieved via separating inventories of the same component for different products. We substantiate this property via computational and theoretical approaches. We show that for low budget levels the use of separate inventories of the same component for different products could achieve a higher reward than with shared inventories. Finally, considering a simple ATO system consisting of one component shared by two products, we characterize the budget ranges such that the use of separate inventories is beneficial, as well as the budget ranges such that component commonality is beneficial.
引用
收藏
页码:29 / 46
页数:17
相关论文
共 50 条
  • [11] Production and Inventory Control of Assemble-to-Order Systems
    Saracalioilu, Nisa
    Sonbahar, Yigit
    Akdeniz, Guner Asrin
    Unsal, Meryem
    Yildiz, Yarkin Yigit
    Cakmakci, Salih Kaan
    Bulut, Onder
    Ozkan, Sinem
    Hokenek, Ceylin
    DIGITIZING PRODUCTION SYSTEMS, ISPR2021, 2022, : 757 - 771
  • [12] Some specially structured assemble-to-order systems
    Zipkin, Paul
    OPERATIONS RESEARCH LETTERS, 2016, 44 (01) : 136 - 142
  • [13] Joint Order Fulfillment and Inventory Management in Assemble-to-Order Generalized W Systems
    Yu, Man
    Zheng, Shaohui
    Chen, Jiguang
    OPERATIONS RESEARCH, 2025,
  • [14] Asymptotically-optimal component allocation for Assemble-to-Order production-inventory systems
    Wan, Haohua
    Wang, Qiong
    OPERATIONS RESEARCH LETTERS, 2015, 43 (03) : 304 - 310
  • [15] Managing an Assemble-to-Order System with Returns
    DeCroix, Gregory A.
    Song, Jing-Sheng
    Zipkin, Paul H.
    M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2009, 11 (01) : 144 - 159
  • [16] Heuristics for Determining Module Stocks in Assemble-to-order Systems
    da Cunha, Catherine
    Frein, Yannick
    JOURNAL OF DECISION SYSTEMS, 2008, 17 (03) : 403 - 424
  • [17] CAPACITY ANALYSIS IN REPETITIVE ASSEMBLE-TO-ORDER MANUFACTURING SYSTEMS
    FUMERO, F
    VERCELLIS, C
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 78 (02) : 204 - 215
  • [18] Dual index production and subcontracting policies for assemble-to-order systems
    Sinha, Ashesh Kumar
    Krishnamurthy, Ananth
    IIE TRANSACTIONS, 2016, 48 (05) : 415 - 427
  • [19] Component-based product knowledge modeling and management for assemble-to-order enterprise
    Zhang, JS
    Zheng, SY
    Xue, CF
    Proceedings of the 2005 International Conference on Management Science and Engineering, 2005, : 785 - 792
  • [20] The Impact of Demand Aggregation Through Delayed Component Allocation in an Assemble-to-Order System
    Bernstein, Fernando
    DeCroix, Gregory A.
    Wang, Yulan
    MANAGEMENT SCIENCE, 2011, 57 (06) : 1154 - 1171