共 99 条
[1]
Stadtler H(2005)Supply chain management and advanced planning—basics, overview and challenges Eur J Oper Res 163 575-588
[2]
Dimopoulos C(2000)Recent development in evolutionary computation for manufacturing optimization: problems, solutions, and comparisons IEEE Trans Evolut Comput 4 93-113
[3]
Zalzala AMS(1994)A no-wait flowshop scheduling heuristic to minimize makespan J Oper Res Soc 45 472-478
[4]
Rajendran C(1984)The three-machine no-wait flowshop problem is NP-complete J Assoc Comput Machinery 31 336-345
[5]
Rock H(1988)No-wait shop scheduling: computational complexity and approximate algorithms Opsearch 25 220-244
[6]
Goyal SK(1996)A survey of machine scheduling problems with blocking and no-wait in process Oper Res 44 510-525
[7]
Sriskandarajah C(1964)Sequencing a one state-variable machine: a solvable case of the travelling salesman problem Oper Res 12 655-679
[8]
Hall NG(1997)Two-stage no-wait scheduling models with setup and removal times separated Comput Oper Res 24 1025-1031
[9]
Sriskandarajah C(2004)Application of ant colony optimization for no-wait flowshop scheduling problem to minimize the total completion time Comput Ind Eng 47 181-193
[10]
Gilmore PC(1996)The ant system: optimization by a colony of cooperating agents IEEE Trans Syst Man Cy B 26 29-41