A heuristic-search genetic algorithm for multi-stage hybrid flow shop scheduling with single processing machines and batch processing machines

被引:0
作者
Dongni Li
Xianwen Meng
Qiqiang Liang
Junqing Zhao
机构
[1] Beijing Institute of Technology,Beijing Lab of Intelligent Information Technology, School of Computer Science
来源
Journal of Intelligent Manufacturing | 2015年 / 26卷
关键词
Hybrid flow shop; Batch processing machine; Single processing machine; Genetic algorithm; Heuristic rule;
D O I
暂无
中图分类号
学科分类号
摘要
This paper addresses the scheduling problem for a multi-stage hybrid flow shop (HFS) with single processing machines and batch processing machines. Each stage consists of nonidentical machines in parallel, and only one of the stages is composed of batch processing machines. Such a variant of the HFS problem is derived from the actual manufacturing of complex products in the equipment manufacturing industry. Aiming at minimizing the maximum completion time and minimizing the total weighted tardiness, respectively, a heuristic-search genetic algorithm (HSGA) is developed in this paper, which selects assignment rules for parts, sequencing rules for machines (including single processing machines and batch processing machines), and batch formation rules for batch processing machines, simultaneously. Then parts and machines are scheduled using the obtained combinatorial heuristic rules. Since the search space composed of the heuristic rules is much smaller than that composed of the schedules, the HSGA results in lower complexity and higher computational efficiency. Computational results indicate that as compared with meta-heuristics that search for scheduling solutions directly, the HSGA has a significant advantage with respect to the computational efficiency. As compared with combinatorial heuristic rules, other heuristic-search approaches, and the CPLEX, the HSGA provides better optimizational performance and is especially suitable to solve large dimension scheduling problems.
引用
收藏
页码:873 / 890
页数:17
相关论文
共 74 条
[1]  
Allahverdi A(2008)A survey of scheduling problems with setup times or costs European Journal Of Operational Research 187 985-1032
[2]  
Ng CT(1997)Simple priority rule combinations: An approach to improve both flow time and tardiness International Journal of Production Research 35 2857-2870
[3]  
Cheng TCE(2012)Realistic two-stage flowshop batch scheduling problems with transportation capacity and times Applied Mathematical Modelling 36 723-735
[4]  
Kovalyov MY(2013)Particle swarm optimization for scheduling batch processing machines in a permutation flowshop International Journal of Advanced Manufacturing Technology 64 989-1000
[5]  
Barman S(1995)Evolution based learning in a job-shop scheduling environment Computers & Operations Research 22 25-40
[6]  
Behnamian J(2005)A fuzzy genetic algorithm for real-world job shop scheduling Innovations in Applied Artificial Intelligence 3533 524-533
[7]  
Ghomi SMTF(2009)Modeling and scheduling for manufacturing grid workflows using timed Petri nets The International Journal of Advanced Manufacturing Technology 42 553-568
[8]  
Jolai F(2009)Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint Journal of Heuristics 15 19-42
[9]  
Amirtaheri O(1989)Performance of simple priority rule combinations in a flow dominant shop Production & Inventory Management Journal 30 1-4
[10]  
Damodaran P(2008)Scheduling multistage batch plants with parallel units and no interstage storage Computers & Chemical Engineering 32 671-693