共 74 条
[1]
Allahverdi A(2008)A survey of scheduling problems with setup times or costs European Journal Of Operational Research 187 985-1032
[2]
Ng CT(1997)Simple priority rule combinations: An approach to improve both flow time and tardiness International Journal of Production Research 35 2857-2870
[3]
Cheng TCE(2012)Realistic two-stage flowshop batch scheduling problems with transportation capacity and times Applied Mathematical Modelling 36 723-735
[4]
Kovalyov MY(2013)Particle swarm optimization for scheduling batch processing machines in a permutation flowshop International Journal of Advanced Manufacturing Technology 64 989-1000
[5]
Barman S(1995)Evolution based learning in a job-shop scheduling environment Computers & Operations Research 22 25-40
[6]
Behnamian J(2005)A fuzzy genetic algorithm for real-world job shop scheduling Innovations in Applied Artificial Intelligence 3533 524-533
[7]
Ghomi SMTF(2009)Modeling and scheduling for manufacturing grid workflows using timed Petri nets The International Journal of Advanced Manufacturing Technology 42 553-568
[8]
Jolai F(2009)Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint Journal of Heuristics 15 19-42
[9]
Amirtaheri O(1989)Performance of simple priority rule combinations in a flow dominant shop Production & Inventory Management Journal 30 1-4
[10]
Damodaran P(2008)Scheduling multistage batch plants with parallel units and no interstage storage Computers & Chemical Engineering 32 671-693