Analysis of Scheduling Schemes and Heuristic Rules Performance in Resource-Constrained Multiproject Scheduling

被引:22
作者
Antonio Lova
Pilar Tormos
机构
[1] Universidad Politécnica de Valencia,Department of Statistics and Operations Research
来源
Annals of Operations Research | 2001年 / 102卷
关键词
project management; multiproject scheduling; heuristic based on priority rules; resource allocation; project management software;
D O I
暂无
中图分类号
学科分类号
摘要
Frequently, the availability of resources assigned to a project is limited and not sufficient to execute all the concurrent activities. In this situation, decision making about their schedule is necessary. Many times this schedule supposes an increase in the project completion time. Additionally, companies commonly manage various projects simultaneously, sharing a pool of renewable resources. Given these resource constraints, we often can only apply heuristic methods to solve the scheduling problem. In this work the effect of the schedule generation schemes – serial or parallel – and priority rules – MINLFT, MINSLK, MAXTWK, SASP or FCFS – with two approaches – multi-project and single-project – are analysed. The time criteria considered are the mean project delay and the multiproject duration increase. Through an extensive computational study, results show that with the parallel scheduling generation scheme and the multi-project approach the project manager can obtain a good multiproject schedule with the time criterion selected: minimising mean project delay or minimising multiproject duration increase. New heuristics – based on priority rules with a two-phase approach – that outperform classical ones are proposed to minimise mean project delay with a multi-project approach. Finally, the best heuristics analysed are evaluated together with a representative sample of commercial project management software.
引用
收藏
页码:263 / 286
页数:23
相关论文
共 50 条
  • [31] Investigating the performance of an artificial neural network for selecting priority rules for solving the resource-constrained project scheduling problem (RCPSP)
    Golab, Amir
    Gooya, Ehsan Sedgh
    Al Falou, Ayman
    Cabon, Mikael
    PATTERN RECOGNITION AND TRACKING XXXIII, 2022, 12101
  • [32] Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patterns
    He, Yukang
    Jia, Tao
    Zheng, Weibo
    ANNALS OF OPERATIONS RESEARCH, 2024, 338 (01) : 115 - 149
  • [33] Tools for resource-constrained project scheduling and control: forward and backward slack analysis
    Tormos, P
    Lova, A
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2001, 52 (07) : 779 - 788
  • [34] An efficient simulation algorithm for Resource-Constrained Project Scheduling Problem
    Peng, L.
    Wuliang, P.
    Open Mechanical Engineering Journal, 2014, 8 (01): : 9 - 13
  • [35] Hybrid multimode resource-constrained maintenance project scheduling problem
    Kosztyan, Zsolt T.
    Pribojszki-Nemeth, Aniko
    Szalkai, Istvan
    OPERATIONS RESEARCH PERSPECTIVES, 2019, 6
  • [36] A contribution to shift algorithms for resource-constrained scheduling with dynamic changes
    Seda, Milos
    PROCEEDINGS OF THE 11TH WSEAS INTERNATIONAL CONFERENCE ON SYSTEMS, VOL 2: SYSTEMS THEORY AND APPLICATIONS, 2007, : 401 - +
  • [37] Resource-constrained multi-project scheduling problem: A survey
    Gomez Sanchez, Mariam
    Lalla-Ruiz, Eduardo
    Gil, Alejandro Fernandez
    Castro, Carlos
    Voss, Stefan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 309 (03) : 958 - 976
  • [38] Solving resource-constrained project scheduling problem with evolutionary programming
    Sebt, M. H.
    Alipouri, Y.
    Alipouri, Y.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2013, 64 (09) : 1327 - 1335
  • [39] Efficient genetic algorithm for resource-constrained project scheduling problem
    Wang H.
    Li T.
    Lin D.
    Transactions of Tianjin University, 2010, 16 (5) : 376 - 382
  • [40] Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem
    王宏
    李同玲
    林丹
    Transactions of Tianjin University, 2010, 16 (05) : 376 - 382