Minmax due-date assignment with a time window for acceptable lead-times

被引:0
作者
Enrique Gerstl
Gur Mosheiov
机构
[1] The Hebrew University,School of Business Administration
来源
Annals of Operations Research | 2013年 / 211卷
关键词
Scheduling; Single machine; Due-date assignment; Minmax; Lead-time;
D O I
暂无
中图分类号
学科分类号
摘要
In a standard DIF due-date assignment model, customers may consider late due-dates as unacceptable, i.e., if a due-date is assigned later than a pre-specified lead time, the supplier is penalized. This note extends this setting by adding a lower bound on the acceptable lead-time, reflecting e.g., the time needed by the customer for preparation of storage space. Thus, in addition to the standard earliness/tardiness penalties of jobs, our model contains penalties for early and tardy due-dates. The objective is of a minmax type, i.e. we try to minimize the highest (job and due-date) cost. An efficient O(n) solution algorithm (where n is the number of jobs) is introduced.
引用
收藏
页码:167 / 177
页数:10
相关论文
共 50 条
[31]   Common due-date assignment problems with fixed-plus-linear earliness and tardiness costs [J].
Atsmony, Matan ;
Mosheiov, Gur .
COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 188
[32]   Branch-and-Bound and Heuristic Algorithms for Group Scheduling with Due-Date Assignment and Resource Allocation [J].
He, Hongyu ;
Zhao, Yanzhi ;
Ma, Xiaojun ;
Lv, Zheng-Guo ;
Wang, Ji-Bo .
MATHEMATICS, 2023, 11 (23)
[33]   Minmax scheduling and due-window assignment with position-dependent processing times and job rejection [J].
Mosheiov, Gur ;
Sarig, Assaf ;
Strusevich, Vitaly .
4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2020, 18 (04) :439-456
[34]   Minmax scheduling and due-window assignment with position-dependent processing times and job rejection [J].
Gur Mosheiov ;
Assaf Sarig ;
Vitaly Strusevich .
4OR, 2020, 18 :439-456
[35]   Due-date assignment and machine scheduling in a low machine-rate situation with stochastic processing times [J].
Iranpoor, Mehdi ;
Ghomi, S. M. T. Fatemi ;
Zandieh, M. .
COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (04) :1100-1108
[36]   Optimal Different Due-Date Assignment Scheduling with Group Technology and Resource Allocation [J].
Wang, Xuyin ;
Liu, Weiguo .
MATHEMATICS, 2024, 12 (03)
[37]   A note on a due-date assignment on a two-machine flow-shop [J].
Birman, M ;
Mosheiov, G .
COMPUTERS & OPERATIONS RESEARCH, 2004, 31 (03) :473-480
[38]   A common due-date assignment problem with job rejection on parallel uniform machines [J].
Mosheiov, Gur ;
Sarig, Assaf .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024, 62 (06) :2083-2092
[39]   ON THE MULTIPLE-MACHINE EXTENSION TO A COMMON DUE-DATE ASSIGNMENT AND SCHEDULING PROBLEM [J].
DE, P ;
GHOSH, JB ;
WELLS, CE .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1991, 42 (05) :419-422
[40]   An analytical approach to improving due-date and lead-time dynamics in production systems [J].
Duffle, N. ;
Bendul, J. ;
Knollmann, M. .
JOURNAL OF MANUFACTURING SYSTEMS, 2017, 45 :273-285