An ISM approach for modelling the enablers in the implementation of Total Productive Maintenance (TPM)

被引:58
作者
Attri R. [1 ]
Grover S. [1 ]
Dev N. [1 ]
Kumar D. [2 ]
机构
[1] Department of Mechanical Engineering, YMCA University of Science and Technology
[2] Department of Mechanical Engineering, Advanced Institute of Technology and Management
关键词
Enablers; Interpretive structural modelling; Total productive maintenance; TPM;
D O I
10.1007/s13198-012-0088-7
中图分类号
学科分类号
摘要
Total Productive maintenance (TPM) is increasingly implemented by many organizations to improve their equipment efficiency and to obtain the competitive advantage in the global market in terms of cost and quality. But, implementation of TPM is not an easy task. There are certain enablers, which help in the implementation of TPM. The utmost need is to analyse the behaviour of these enablers for their effective utilization in the implementation of TPM. The main objective of this paper is to understand the mutual interaction of these enablers and identify the 'driving enablers' (i.e. which influence the other enablers) and the 'dependent enablers' (i.e. which are influenced by others). In the present work, these enablers have been identified through the literature, their ranking is done by a questionnaire-based survey and interpretive structural modelling (ISM) approach has been utilized in analysing their mutual interaction. An ISM model has been prepared to identify some key enablers and their managerial implications in the implementation of TPM. © 2012 The Society for Reliability Engineering, Quality and Operations Management (SREQOM), India and The Division of Operation and Maintenance, Lulea University of Technology, Sweden.
引用
收藏
页码:313 / 326
页数:13
相关论文
共 66 条
[1]  
Agarwal A., Shankar R., Tiwari M.K., Modeling agility of supply chain, Ind Mark Manag, 36, pp. 443-457, (2006)
[2]  
Agyris C., Empowerment: The emperor's new clothes, Harvard Bus Rev, 76, 3, pp. 98-105, (1998)
[3]  
Ahuja I.P.S., Khamba J.S., Strategies and success factors for overcoming challenges in TPM implementation in Indian manufacturing industry, J Qual Maint Eng, 14, 2, pp. 123-147, (2008)
[4]  
Ahuja I.P.S., Khamba J.S., Total productive maintenance: Literature review and directions, Int J Qual Reliab Manag, 25, 7, pp. 709-756, (2008)
[5]  
Badiru A.B., Schlegel R.E., Project management in computer-integrated manufacturing implementation, Organization and Management of Advanced Manufacturing, pp. 255-279, (1994)
[6]  
Bamber C.J., Sharp J.M., Hides M., Factors affecting successful implementation of total productive maintenance: A UK manufacturing case study perspective, J Qual Maint Eng, 5, 3, pp. 162-181, (1999)
[7]  
Banwet D.K., Arora R., Enablers and inhibitors of e-commerce implementation in India-an interpretive structural modelling (ISM) approach, Operations Management for Global Economy Challenges and Prospects, pp. 332-341, (1999)
[8]  
Blanchard B.S., An enhanced approach for implementing total productive maintenance in the manufacturing environment, J Qual Maint Eng, 3, 2, pp. 69-80, (1997)
[9]  
Bolanos R., Fontela E., Nenclares A., Paster P., Using interpretive structural modeling in strategic decision making groups, Manag Decis, 43, 6, pp. 877-895, (2005)
[10]  
Chan F.T.S., Lau H.C.W., Ip R.W.L., Chan H.K., Kong S., Implementation of total productive maintenance: A case study, Int J Prod Econ, 95, pp. 71-94, (2005)