Effect of Aeration Rate on Nutrient Removal from Slaughterhouse Wastewater in Intermittently Aerated Sequencing Batch Reactors

被引:0
作者
Jianping Li
Mark G. Healy
Xinmin Zhan
Daniel Norton
Michael Rodgers
机构
[1] National University of Ireland,Department of Civil Engineering and Environmental Change Institute
[2] Galway,undefined
来源
Water, Air, and Soil Pollution | 2008年 / 192卷
关键词
Aeration rate; Intermittent aeration; Nutrient removal; Slaughterhouse wastewater; Sequencing batch reactor;
D O I
暂无
中图分类号
学科分类号
摘要
The effect of aeration rate on nutrient removal from slaughterhouse wastewater was examined in two 10-L laboratory-scale sequencing batch reactors (SBRs—SBR1 and SBR2) operated at ambient temperature. The contaminants in the slaughterhouse wastewater had average concentrations of 4,000 mg chemical oxygen demand (COD) L−1, 350 mg total nitrogen (TN) L−1 and 26 mg total phosphorus (TP) L−1. The duration of a complete SBR operation cycle was 8 h and comprised four operational phases: fill (7 min), react (393 min), settle (30 min) and draw/idle (50 min). During the react phase, the reactors were intermittently aerated four times at 50-min intervals, 50 min each time. DO, pH and oxidation–reduction potential (ORP) in the reactors were real-time monitored. Four aeration rates—0.2 L air min−1 in SBR1 for 70 days, 0.4 L air min−1 in SBR1 for 50 days, 0.8 L air min−1 in SBR2 for 120 days and 1.2 L air min−1 in SBR1 for 110 days—were tested. When the aeration rate was 0.2 L air min−1, the SBR was continuously anaerobic. When the aeration rate was 0.4 L air min−1, COD and TP removals were 90% but TN removal was only 34%. When the aeration rates were 0.8 and 1.2 L air min−1, average effluent concentrations were 115 mg COD L−1, 19 mg TN L−1 and 0.7 mg TP L−1, giving COD, TN and TP removals of 97%, 95% and 97%, respectively. It was found that partial nitrification followed by denitrification occurred in the intermittently aerated SBR systems.
引用
收藏
页码:251 / 261
页数:10
相关论文
共 81 条
[1]  
Casellas M.(2006)Set up and assessment of a control strategy in a SBR in order to enhance nitrogen and phosphorus removal Process Biochemistry 41 1994-2001
[2]  
Dagot C.(2005)Nitrogen and phosphorus removal from an abattoir wastewater in a SBR with aerobic granular sludge Water Research 39 4817-4823
[3]  
Baudu M.(2007)Effective partial nitrification to nitrite by down-flow hanging sponge reactor under limited oxygen condition Water Research 41 295-302
[4]  
Cassidy D. P.(2005)Partial nitrification of high ammonia concentration wastewater as a part of a shortcut biological nitrogen removal process Process Biochemistry 40 1715-1719
[5]  
Belia E.(2005)Integrated anaerobic–aerobic fixed-film reactor for slaughterhouse wastewater treatment Water Research 39 1114-1122
[6]  
Chuang H. P.(2005)Phosphorus co-precipitation in the biological treatment of slaughterhouse wastewater in a sequencing batch reactor Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management 9 179-192
[7]  
Ohashi A.(2003)Anaerobic treatment of wastewater with high organic content using a stirred tank reactor coupled with a membrane filtration unit Water Research 37 902-908
[8]  
Imachi H.(1995)Sources of nutrients in wastewater from integrated cattle slaughterhouses Water Science and Technology 32 53-58
[9]  
Tandukar M.(2001)pH and oxidation–reduction potential control strategy for optimization of nitrogen removal in an alternating aerobic–anoxic system Water Environment Research 73 95-102
[10]  
Harada H.(1997)Occurrence of denitrifying phosphorus removing bacteria in modified UCT-type wastewater treatment plants Water Research 31 777-786