Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling

被引:0
|
作者
Rob Van Eynde
Mario Vanhoucke
机构
[1] Ghent University,Faculty of Economics and Business Administration
[2] Vlerick Business School,UCL School of Management
[3] University College London,undefined
来源
Journal of Scheduling | 2020年 / 23卷
关键词
Multi-project scheduling; Portfolio scheduling; Summary measures; Decoupled scheduling; Benchmark data;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, we propose a new dataset for the resource-constrained multi-project scheduling problem and evaluate the performance of multi-project extensions of the single-project schedule generation schemes. This manuscript contributes to the existing research in three ways. First, we provide an overview of existing benchmark datasets and classify the multi-project literature based on the type of datasets that are used in these studies. Furthermore, we evaluate the existing summary measures that are used to classify instances and provide adaptations to the data generation procedure of Browning and Yassine (J Scheduling 13(2):143-161, 2010a). With this adapted generator we propose a new dataset that is complimentary to the existing ones. Second, we propose decoupled versions of the single-project scheduling schemes, building on insights from the existing literature. A computational experiment shows that the decoupled variants outperform the existing priority rule heuristics and that the best priority rules differ for the two objective functions under study. Furthermore, we analyse the effect of the different parameters on the performance of the heuristics. Third, we implement a genetic algorithm that incorporates specific multi-project operators and test it on all datasets. The experiment shows that the new datasets are challenging and provide opportunities for future research.
引用
收藏
页码:301 / 325
页数:24
相关论文
共 50 条
  • [21] A three-stage solution approach with a repeated-negotiation mechanism for the decentralized resource-constrained multi-project scheduling problem
    Mao, Hongri
    Yuan, Jianbo
    KYBERNETES, 2024,
  • [22] Three-phase CPLEX with quota auction mechanism for dedicated resource-constrained multi-project scheduling problem with calendar constraints
    Kong, Feng
    Chen, Kaixin
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2025,
  • [23] Research on priority rules for the stochastic resource constrained multi-project scheduling problem with new project arrival
    Chen, HaoJie
    Ding, Guofu
    Zhang, Jian
    Qin, Shengfeng
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 137
  • [24] A two-phase approach for solving the multi-skill resource-constrained multi-project scheduling problem: a case study in construction industry
    Hosseinian, Amir Hossein
    Baradaran, Vahid
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (01) : 321 - 363
  • [25] Resource Constrained Multi-project Scheduling: A Priority Rule Based Evolutionary Local Search Approach
    Chakrabortty, Ripon K.
    Sarker, Ruhul A.
    Essam, Daryl L.
    INTELLIGENT AND EVOLUTIONARY SYSTEMS, IES 2016, 2017, 8 : 75 - 86
  • [26] Multi-project Flexible Resource Profiles Project Scheduling with Ant Colony Optimization
    Rokou, E.
    Dermitzakis, M.
    Kirytopoulos, K.
    2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 642 - 646
  • [27] Solving resource-constrained multi-project environment under different activity assumptions
    Ben Issa S.
    Patterson R.A.
    Tu Y.
    International Journal of Production Economics, 2021, 232
  • [28] A Two-Stage Algorithm Based on 12 Priority Rules for the Stochastic Distributed Resource-Constrained Multi-Project Scheduling Problem With Multi-Skilled Staff
    Yu, Yining
    Xu, Zhe
    Zhao, Song
    IEEE ACCESS, 2023, 11 : 29554 - 29565
  • [29] Multi-project scheduling problem under shared multi-skill resource constraints
    Haroune, Meya
    Dhib, Cheikh
    Neron, Emmanuel
    Soukhal, Ameur
    Babou, Hafed Mohamed
    Nanne, Mohamedade Farouk
    TOP, 2023, 31 (01) : 194 - 235
  • [30] Multi-project scheduling under uncertainty and resource flexibility: a systematic literature review
    Aghileh, Marzieh
    Tereso, Anabela
    Alvelos, Filipe
    Monteiro Lopes, Maria Odete
    PRODUCTION AND MANUFACTURING RESEARCH-AN OPEN ACCESS JOURNAL, 2024, 12 (01):