Developing an optimal appointment scheduling for systems with rigid standby time under pre-determined quality of service

被引:0
作者
Illana Bendavid
Yariv N. Marmor
Boris Shnits
机构
[1] ORT Braude College of Engineering,Department of Industrial Engineering and Management
来源
Flexible Services and Manufacturing Journal | 2018年 / 30卷
关键词
Optimization; Appointment scheduling; Healthcare systems; Quality of service; Simulation;
D O I
暂无
中图分类号
学科分类号
摘要
A critical step in patient care path is diagnosis. The demand for advanced imaging tests, such as computerized axial tomography, magnetic resonance imaging and positron emission tomography (PET), increased dramatically in the past 15 years. Since imaging equipment remains relatively expensive, in order to fit the demand, the imaging resources must be managed effectively while ensuring required quality of service. In PET, a radiopharmaceutical (radioactive substance) is injected to patients prior to their scans. The time between substance injection and scan (standby or uptake time) is rigid. This constraint makes the patient appointment scheduling more challenging, because if at the end of the expected uptake time the scanner is not available, the quality of the scan is jeopardized (due to short half-life duration of the substance). The availability of the scanner is a consequence of prior scans’ appointments and durations. The aim of this work is to develop an approach for appointment scheduling in a system with one scanner, given a sequence of patients and rigid uptake time, in order to minimize the length of day while satisfying a minimal pre-determined quality of service. In order to solve this stochastic problem, we formulate its equivalent deterministic problem, based on simulated data, as a mixed-integer linear programming. To overcome the dimensionality limitations, we develop a simulation-based sequential algorithm that solves the problem in a reasonable time. We found that a fixed slot per scan policy, as a benchmark, is inferior to our method, especially in achieving stable and fair quality of service for patients.
引用
收藏
页码:54 / 77
页数:23
相关论文
共 36 条
  • [1] Begen MA(2011)Appointment scheduling with discrete random durations Math Oper Res 36 240-257
  • [2] Queyranne M(2009)Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology Ann Oper Res 172 259-276
  • [3] Bendavid I(2011)Predetermined intervals for start times of activities in the stochastic project scheduling problem Ann Oper Res 186 429-442
  • [4] Golany B(1997)Surgical process scheduling: a structured review J Soc Health Syst 5 17-30
  • [5] Bendavid I(2003)Outpatient scheduling in health care: a review of literature Prod Oper Manag 12 519-549
  • [6] Golany B(2003)Sequential bounding approach for optimal appointment scheduling IIE Trans 35 1003-1016
  • [7] Blake JT(2002)Optimal leadtime planning in serial production systems with earliness and tardiness costs IIE Trans 34 233-243
  • [8] Carter MW(2001)On the optimal release time of jobs with random processing times, with extensions to other criteria Int J Prod Econ 74 103-113
  • [9] Cayirli T(2000)Optimal start times under stochastic activity durations Int J Prod Econ 64 153-164
  • [10] Veral E(2008)Appointment scheduling in health care: challenges and opportunities IIE Trans 40 800-819