Estimating product development cycle time using Petri nets
被引:0
作者:
S. Kumanan
论文数: 0引用数: 0
h-index: 0
机构:National Institute of Technology,Department of Production Engineering
S. Kumanan
O.V. Krishnaiah Chetty
论文数: 0引用数: 0
h-index: 0
机构:National Institute of Technology,Department of Production Engineering
O.V. Krishnaiah Chetty
机构:
[1] National Institute of Technology,Department of Production Engineering
[2] Indian Institute of Technology Madras,Manufacturing Engineering Section, Department of Mechanical Engineering
来源:
The International Journal of Advanced Manufacturing Technology
|
2006年
/
28卷
关键词:
PERT & CPM and Petri nets;
Product
development;
Project management ;
D O I:
暂无
中图分类号:
学科分类号:
摘要:
Product development has increased importance in business due to stiff competition and a fast changing business environment. Researchers recommend the project management approach but the existing planning tools are limited in application necessitating improved tools. In this paper the application of Petri nets to determine product development time is described and exemplified by a case study.