共 30 条
[1]
Holthaus O(1999)Scheduling in job shops with machine breakdowns: an experimental study Comput Ind Eng 36 137-162
[2]
Blackstone JH(1982)A state-of-the-art survey of dispatching rules for manufacturing job shop operations Int J Prod Res 20 27-45
[3]
Philips DT(1999)A review of scheduling research involving setup considerations Omega 27 219-239
[4]
Hogg GL(1996)A branch-and-bound method for general shop problems with sequence-dependent setup times OR Spectrum 18 145-161
[5]
Allahverdi A(1997)Job shop scheduling with separable sequence-dependent setups Ann Oper Res 70 155-170
[6]
Gupta JND(2001)List scheduling in a parallel machine environment with precedence constraints and setup times OR Spectrum 18 145-161
[7]
Aldowaisan T(2003)Genetic algorithms applied in BOPP film scheduling problems: minimizing total absolute deviation and setup times Appl Soft Comput 3 139-148
[8]
Brucker P(2005)Schedule generation schemes for the job-shop problem with sequence-dependent setup times: dominance properties and computational analysis Ann Oper Res 138 21-52
[9]
Thiele O(2006)A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times Int J Prod Econ 99 63-73
[10]
Choi I-C(1990)Dynamic job shop scheduling: a survey of simulation research OMEGA: Int J Manage Sci 18 43-57