- [1] Dehghani H.(2011)Development of a model to predict peak particle velocity in a blasting operation Internat. Jour. Rock Mechanics and Mining Sci. 48 51-58
- [2] Ataee-Pour M.(2004)Effect of explosive type on particle velocity criteria in ground vibration Jour Explosive Engg., USA 21 34-39
- [3] Hossaini S.M.F.(2006)Environmental impacts of bench blasting at Hisarcik Boron open pit mine in Turkey Environ. Geol. 507 1015-1023
- [4] Sen G.C.(2002)Analysis of ground vibrations caused by bench blasting at open-pit lignite mine in Turkey Environ. Geol. 41 653-6__
- [5] Kahriman A.(2009)Prediction of blastinduced ground vibration using artificial neural network Internat. Jour. Rock Mech. Min. Sci. 46 1214-1222
- [6] Ozer U.(2005)An assessment of environmental impacts of quarry-blasting operation: a case study in Istanbul Turkey. Environ. Geol. 482 211-217
- [7] Aksoy M.(2005)Underground blast induced ground shock and its modeling using artificial neural network Computers and Geotechnics 32 164-170
- [8] Karadogan A.(1943)A Logical calculus in the ideas immanent in nervous activity Bull. Mathematical Biophysics 5 115-133
- [9] Tuncer G.(2008)The analysis of ground vibrations induced by bench blasting at Akyol quarry and practical blasting charts Environ. Geol. 54 737-743
- [10] Kahriman A(2005)Prediction of maximum safe charge per delay in surface mining Mining Technology (Trans. Inst. Min. Metall. — A) 114 227-231