共 43 条
[1]
Bolat A(1994)Sequencing jobs on an automobile assembly line: objectives and procedures Int J Prod Res 32 1219-1236
[2]
Burdett RL(2001)Sequencing and scheduling in flowshops with task redistribution J Oper Res Soc 52 1379-1389
[3]
Kozan E(1976)The complexity of flowshop and jobshop scheduling Math Oper Res 1 117-129
[4]
Garey MR(1964)Sequencing a one state-variable machine: a solvable case of the traveling salesman problem Oper Res 12 655-679
[5]
Johnson DS(1979)Optimization and approximation in deterministic sequencing and scheduling: a survey Ann Discrete Math 5 287-326
[6]
Sethi R(2006)Flowshop scheduling research after five decades Eur J Oper Res 169 699-711
[7]
Gilmore PC(2004)Scheduling three-operation jobs in a two-machine flow shop to minimize makespan Ann Oper Res 129 171-185
[8]
Gomory RE(1996)A survey of machine scheduling problems with blocking and no-wait in process Oper Res 44 510-525
[9]
Graham RL(1988)General flow-shop scheduling with resource constraints Int J Prod Res 26 1089-1103
[10]
Lawler EL(1954)Optimal two-and three-stage production schedules with setup times included Nav Res Logist Q 1 61-68