共 50 条
- [2] STEAM GENERATOR REPLACEMENT AT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE 2010, VOL 7, 2010, : 237 - 245
- [3] STEAM-GENERATOR REPLACEMENT AT SURRY POWER-STATION UNIT-1 AND UNIT-2 - A POSTREPLACEMENT SYNOPSIS TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1983, 44 : 494 - 494
- [4] TESTS ON IMPROVED STEAM SEPARATORS IN THE 3RD UNIT AT THE CHERNOBYL NUCLEAR-POWER STATION SOVIET ATOMIC ENERGY, 1984, 57 (06): : 807 - 811
- [6] Laboratory examination results from Oconee Nuclear Station once through steam generator tubes PROCEEDINGS OF THE NINTH INTERNATIONAL SYMPOSIUM ON ENVIRONMENTAL DEGRADATION OF MATERIALS IN NUCLEAR POWER SYSTEMS-WATER REACTORS, 1999, : 639 - 646
- [7] Steam generator replacement project at TVA's Sequoyah Unit 1 Nuclear Power Plant PROCEEDINGS OF 2004 ASME POWER, 2004, : 35 - 40
- [10] Evaluation of Acceptance Tests on the 1300 MW Unit at Philippsburg Nuclear Power Station (KKP 2). VGB-Kraftwerkstechnik, 1987, 67 (02): : 103 - 109