Equipment of the binary-cycle geothermal power unit at the Pauzhet geothermal power station

被引:1
作者
Tomarov G.V. [1 ]
Nikol'Skii A.I. [1 ]
Semenov V.N. [1 ]
Shipkov A.A. [1 ]
机构
[1] Geoterm-EM, Moscow 111250
关键词
binary cycle; geothermal power station; heat-transfer equipment; organic working fluid; Pauzhet geothermal power station; turbine generator; turbine unit;
D O I
10.1134/S0040601514060093
中图分类号
学科分类号
摘要
The equipment of and technological processes in the pilot industrial model of the domestically produced binary-cycle geothermal power unit operating on the discharge separate at the Pauzhet geothermal power station are considered. The development principles, the design and operational features, and the data on selecting the metal in manufacturing the main equipment of the 2.5-MW binary power unit of the geothermal power station are described. © 2014 Pleiades Publishing, Inc.
引用
收藏
页码:406 / 410
页数:4
相关论文
共 4 条
[1]  
Tomarov G.V., Nikol'Skii A.I., Semenov V.N., Shipkov A.A., Parshin B.E., Trends and prospects of development of geothermal power engineering, Therm. Eng., 59, 11, (2012)
[2]  
Tomarov G.V., Nikol'Skii A.I., Semenov V.N., Shipkov A.A., Construction of Russia's pilot binary power unit at the Pauzhet geothermal power station, Therm. Eng., 57, 11, (2010)
[3]  
Povarov O.A., Tomarov G.V., Kutyrev S.Y., Velichko E.V., Salt deposit problems and wear of geothermal power installation components, TsNIITE-Ityazhmash Review, Ser. 3, Issue 12, (1991)
[4]  
Dipippo R., Geothermal Power Plants: Principles, Applications, Case Studies and Environmental Impact, (2008)