共 55 条
[1]
Bay H.(2008)Speeded-Up Robust Features (SURF) Comput. Vis. Image Und. 110 346-359
[2]
Ess A.(2014)Markerless vision-based augmented reality for urban planning Computer-Aided Civ. Inf. 29 2-17
[3]
Tuytelaars T.(2013)Towards cloud Augmented Reality for construction application by BIM and SNS integration Automat. Constr. 33 37-47
[4]
Gool L. V.(2013)Development of a 4D object-based system for visualizing the risk information of construction projects Automat. Constr. 31 186-203
[5]
Carozza L.(2016)Managing construction schedule by telepresence: Integration of site video feed with an active nD CAD simulation Automat. Constr. 68 32-43
[6]
Tingdahl D.(2012)Interactive modeler for construction equipment operation using augmented reality J. Comput. Civ. Eng. 26 331-341
[7]
Bosche F.(2013)Field applicability of augmented reality technology by marker mapping for construction project: Focused on measurement process of rebar work Korean J. Civil. Eng. 33 2509-2518
[8]
Gool L. V.(2014)A defect management system for reinforced concrete work utilizing BIM, image-matching and augmented reality Automat. Constr. 46 74-81
[9]
Jiao Y.(2004)Distinctive image features from scale-invariant keypoints Int. J. Comput. Vision 60 91-110
[10]
Zhang S.(2012)Augmented Reality for 3D Construction ICMOC 2012. Procedia Engineer 38 66-72