Improvement of Realism of 4D Objects Using Augmented Reality Objects and Actual Images of a Construction Site

被引:0
作者
Hyeon Seung Kim
Sung-Keun Kim
Andre Borrmann
Leen Seok Kang
机构
[1] Univesity of Michigan,Dept. of Civil Engineering
[2] Seoul National University of Science & Technology,Dept. of Civil Engineering
[3] Technical University of Munich,Leonhard Obermeyer Center
[4] Gyeongsang National University, Center of Digital Methods for the Built Environment
来源
KSCE Journal of Civil Engineering | 2018年 / 22卷
关键词
augmented reality; telepresence; 4D CAD; 5D CAD; BIM;
D O I
暂无
中图分类号
学科分类号
摘要
Many construction firms have begun carrying out schedule management by using digital methods, such as 3D CAD and building information model (BIM)s. However, such methods are hampered by discrepancies between virtual models and real world models. This study develops an augmented reality (AR)-based 4D CAD system, which connects 4D and 5D objects with a real field image and an AR object. A method to link 4D objects and AR objects is proposed in order to implement several types of schedule information, as well as to enable the use of constantly changing schedule information through AR objects. Furthermore, a method for implementing AR objects based on connecting real-time field images is presented to help long distance managers become more accustomed to virtual objects and to enable better reflecting field environmental conditions in schedule management. In this study, the AR-based 4D CAD system using these methods is suggested and applied in a case study to verify the applicability of the system. The proposed system can be used for field monitoring for schedule management at job sites and to support cooperation and decision making between long distance managers and field engineers.
引用
收藏
页码:2735 / 2746
页数:11
相关论文
共 55 条
[1]  
Bay H.(2008)Speeded-Up Robust Features (SURF) Comput. Vis. Image Und. 110 346-359
[2]  
Ess A.(2014)Markerless vision-based augmented reality for urban planning Computer-Aided Civ. Inf. 29 2-17
[3]  
Tuytelaars T.(2013)Towards cloud Augmented Reality for construction application by BIM and SNS integration Automat. Constr. 33 37-47
[4]  
Gool L. V.(2013)Development of a 4D object-based system for visualizing the risk information of construction projects Automat. Constr. 31 186-203
[5]  
Carozza L.(2016)Managing construction schedule by telepresence: Integration of site video feed with an active nD CAD simulation Automat. Constr. 68 32-43
[6]  
Tingdahl D.(2012)Interactive modeler for construction equipment operation using augmented reality J. Comput. Civ. Eng. 26 331-341
[7]  
Bosche F.(2013)Field applicability of augmented reality technology by marker mapping for construction project: Focused on measurement process of rebar work Korean J. Civil. Eng. 33 2509-2518
[8]  
Gool L. V.(2014)A defect management system for reinforced concrete work utilizing BIM, image-matching and augmented reality Automat. Constr. 46 74-81
[9]  
Jiao Y.(2004)Distinctive image features from scale-invariant keypoints Int. J. Comput. Vision 60 91-110
[10]  
Zhang S.(2012)Augmented Reality for 3D Construction ICMOC 2012. Procedia Engineer 38 66-72