The Characteristics of Roof Breaking and the Law of Ground Pressure Behavior in Fully Mechanized Top-coal Caving Face with Large Mining Height

被引:0
|
作者
Dezhong Kong
Yahui Lou
Shangshang Zheng
Shijiang Pu
机构
[1] Mining College of Guizhou University,Faculty of Resources and Safety Engineering
[2] Guizhou Coal Mine Design and Research Institute,undefined
[3] China University of Mining and Technology,undefined
关键词
Large mining height; Fully mechanized top-coal caving face; "Rock-gangue" structure; Caving step distance; Support strength;
D O I
暂无
中图分类号
学科分类号
摘要
In view of the characteristics of large overburden movement space, strong mining disturbance and difficult to determine the initial pressure step distance of the roof in fully mechanized top-coal caving face with large mining height, the working face 101 of a coal mine is taken as the engineering background, through theoretical analysis, numerical simulation and field measurement methods are used to analyze the roof breakage characteristics and mining pressure appearance law of fully mechanized top-coal caving face with large mining height. Firstly, the mining conditions of the working face are systematically introduced, and the influence of the fully mechanized top-coal caving face with large mining height mining conditions on the roof is analyzed. It is obtained that the direct roof collapses and forms an irregular upper direct roof and a regular lower direct roof. Large massive fine-grained sandstone above the working face are extruded into each other to form a semi-arched "rock-gangue" structure. The UDEC software is used to conduct numerical simulation to verify the initial caving step distance of the direct roof of the top coal, mudstone and fine-grained sandstone, and the broken structure of the roof of the fully mechanized top-coal caving face with large mining height under different propulsion lengths and the plastic zone and stress distribution of the roof are obtained. The research shows that: the first caving step distance of top coal is 14.52 m, the first caving step distance of mudstone is 24.06 m, and the first caving step distance of fine-grained sandstone is 47.83 m; in the special case of failure and instability of "rock-gangue" structure, the reasonable support strength PT of the support shall be no less than 1.13 MPa to meet the requirements of roof support. Through the online monitoring of the working resistance of the hydraulic support through the support resistance monitoring system of the fully mechanized top-coal caving face 101 with large mining height, and through the analysis of the working resistance of the hydraulic support, the breaking characteristics of the roof of the fully mechanized top-coal caving face with large mining height and the regularity of the rock pressure are verified.
引用
收藏
页码:285 / 297
页数:12
相关论文
共 50 条
  • [41] Characters Evaluation of Ground Pressure in Fully Mechanized Top Coal Caving Face in Soft Coal Seams
    Pan, Weidong
    Wu, Xiaohua
    Li, Yang
    ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 3735 - +
  • [42] Analysis of rib spalling mechanism of fully-mechanized top-coal caving face with great mining height in extra-thick coal seam
    Chang Ju-cai
    Xie Guang-xiang
    Zhang Xue-hui
    ROCK AND SOIL MECHANICS, 2015, 36 (03) : 803 - 808
  • [43] Study of roof breaking law of fully mechanized top coal caving mining in ultra-thick coal seam based on fracture mechanics
    Yang Deng-feng
    Zhang Lin-fan
    Chai Mao
    Li Bo
    Bai Yi-fei
    ROCK AND SOIL MECHANICS, 2016, 37 (07) : 2033 - 2039
  • [44] Distribution Law of Abutment Pressure and Support Technology in the Roadway of Repeated Mining in the Fully Mechanized Top Coal Caving Mining Face
    Lv, Fengyuan
    Li, Junmeng
    Wang, Guiyuan
    Wei, Qiming
    Ren, Yuxin
    Pei, Yuancheng
    Ma, Kun
    Gong, Yu
    ADVANCES IN CIVIL ENGINEERING, 2024, 2024
  • [45] Study on Rule of Overburden Failure and Rock Burst Hazard under Repeated Mining in Fully Mechanized Top-Coal Caving Face with Hard Roof
    Cui, Feng
    Dong, Shuai
    Lai, Xingping
    Chen, Jianqiang
    Cao, Jiantao
    Shan, Pengfei
    ENERGIES, 2019, 12 (24)
  • [46] Overlying strata movement law and its strata pressure mechanism in fully mechanized top-coal caving workface with large space
    Kong L.
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2020, 37 (05): : 943 - 950
  • [47] Design of coal pillar with roadway driving along goaf in fully mechanized top-coal caving face
    Chang, Jucai
    Xie, Guangxiang
    Yang, Ke
    MINE SAFETY AND EFFICIENT EXPLOITATION FACING CHALLENGES OF THE 21ST CENTURY, 2010, : 235 - 241
  • [48] Characteristics of gas emission and distribution of fully mechanized top-coal caving face under gas drainage conditions
    Chen, Kai-Yan
    Zhang, Zhan-Guo
    Lin, Bai-Quan
    Liu, Ming-Xing
    Li, Sheng-Guo
    Ding, Jian-Xun
    Song, Kai
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2009, 26 (04): : 418 - 422
  • [49] Research on instability of the triangular coal alongside the goaf in a fully mechanized top-coal caving work face
    Fang, Xin-Qiu
    Xu, Rui-Qiang
    Zhao, Jun-Jie
    Zhongguo Kuangye Daxue Xuebao/Journal of China University of Mining and Technology, 2011, 40 (05): : 678 - 683
  • [50] Research on the Redistribution Law of Lateral Mining Stress and the Bearing Characteristics of Section Coal Pillar in Extra-Thick Fully Mechanized Top-Coal Caving Mining
    Bu, Qingwei
    Tu, Min
    Fu, Baojie
    SHOCK AND VIBRATION, 2021, 2021