共 4 条
[1]
Lv DY(2021)Study on proportionate flowshop scheduling with due-date assignment and position-dependent weights Optim. Lett. 62 595-603
[2]
Wang JB(2015)On equivalence between the proportionate flow shop and single-machine scheduling problems Naval Res. Logist. undefined undefined-undefined
[3]
Panwalkar SS(undefined)undefined undefined undefined undefined-undefined
[4]
Koulamas C(undefined)undefined undefined undefined undefined-undefined