共 76 条
- [1] Arık OA(2022)Weighted earliness/tardiness parallel machine scheduling problem with a common due date Expert Syst. Appl 187 115916-399
- [2] Schutten M(1982)Common due date assignment to minimize total penalty for the one machine Scheduling Problem Oper. Res 30 391-846
- [3] Topan E(1991)Earliness-tardiness scheduling problems, I: Weighted deviation of Completion Times about a common due date Oper. Res 39 836-651
- [4] Panwalkar SS(1981)Minimizing the average deviation of job completion times about a common, due date Nav Res. Logist Q 28 643-310
- [5] Smith ML(1992)Single machine scheduling with coefficient of variation minimization Eur. J. Oper. Res 62 302-588
- [6] Seidmann A(1989)V-shape property of optimal sequence of jobs about a common due date on a single machine Comput. Oper. Res 16 583-402
- [7] Hall NG(1986)A V-shape property of optimal schedule of jobs about a common due date Eur. J. Oper. Res 23 401-109
- [8] Posner ME(2021)Single machine earliness/tardiness scheduling problem with grey processing times and the grey common due date Grey Syst. Theory Appl 11 95-166
- [9] Kanet JJ(1989)Survey of scheduling research involving due date determination decisions Eur. J. Oper. Res 38 156-25
- [10] Raghavachari M(2002)A survey of the state-of-the-art of common due date assignment and scheduling research Eur. J. Oper. Res 139 1-399