共 95 条
[1]
Fathi M(2016)A new heuristic-based bi-objective simulated annealing method for U-shaped assembly line balancing Eur. J. Industrial Eng. 10 145-169
[2]
Álvarez MJ(1955)The assembly line balancing problem J. Industrial Eng. 6 18-25
[3]
Rodríguez V(2007)A classification of assembly line balancing problems Eur. J. Oper. Res. 183 674-693
[4]
Salveson ME(1986)A survey of exact algorithms for the simple assembly line balancing problem Manag. Sci. 32 909-932
[5]
Boysen N(2006)A survey on problems and methods in generalized assembly line balancing Eur. J. Oper. Res. 168 694-715
[6]
Fliedner M(2015)Modeling and solving multi-objective mixed-model assembly line balancing and worker assignment problem Comput. Ind. Eng. 87 74-80
[7]
Scholl A(2012)Mixed model U-line balancing type-1 problem: a new approach J. Manuf. Syst. 31 131-138
[8]
Baybars I(2019)Minimizing the number of workers in a paced mixed-model assembly line Eur. J. Oper. Res. 272 188-194
[9]
Becker C(2018)Balancing a mixed-model assembly line with unskilled temporary workers: algorithm and case study Assem. Autom. 38 511-523
[10]
Scholl A(2016)An effective discrete artificial bee colony algorithm with idle time reduction techniques for two-sided assembly line balancing problem of type-II Comput. Ind. Eng. 97 146-156