Integrating sequence-dependent group scheduling problem and preventive maintenance in flexible flow shops

被引:2
|
作者
Alireza Khamseh
Fariborz Jolai
Morteza Babaei
机构
[1] Islamic Azad University,Faculty of Industrial and Mechanical Engineering, Qazvin Branch
[2] University of Tehran,Department of Industrial Engineering, College of Engineering
[3] Islamic Azad University,Department of Electrical and Computer Engineering
来源
The International Journal of Advanced Manufacturing Technology | 2015年 / 77卷
关键词
Scheduling; Flexible flow shop; Preventive maintenance; Sequence-dependent setup times; Simulated annealing; Genetic algorithm;
D O I
暂无
中图分类号
学科分类号
摘要
This study integrates flexible flow shop group scheduling problem with sequence-dependent setups and preventive maintenance activities in order to minimize the total completion time (makespan). In a group scheduling problem, scheduling of groups and the jobs within each group are determined. As the considered problem is strongly NP-hard, we propose two meta-heuristics based on simulated annealing (SA) and genetic algorithm (GA) to solve it. Matrix solution representation is a key feature of GA-based algorithm that makes possible the representation of groups and the jobs within groups simultaneously. In addition, the SA-based algorithm is equipped with a local search procedure to enhance the quality of its solution. In order to set parameters and better achieve the performances of the algorithms, we exploit Taguchi robust parameter design method. The performance of the proposed algorithms is evaluated on a variety of test problems, namely small- and large-sized problems. Makespan and elapsed central processing unit (CPU, or processing) time to obtain it are considered as two response variables representing effectiveness and efficiency of the algorithms, respectively. The obtained results show that there is statistically significant difference between performances of the proposed algorithms. GA-based algorithm shows better performance on two response variables for both problem sizes (except regarding elapsed CPU time to obtain the best solution for large-sized problems) with a p value of 0 and outperforms SA-based algorithm.
引用
收藏
页码:173 / 185
页数:12
相关论文
共 50 条
  • [41] An immune algorithm for hybrid flow shop scheduling problem with time lags and sequence-dependent setup times
    Javadian, Nikbakhsh
    Fattahi, Parviz
    Farahmand-Mehr, Mohammad
    Amiri-Aref, Mehdi
    Kazemi, Mohammad
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 63 (1-4) : 337 - 348
  • [42] Bi-criteria group scheduling with sequence-dependent setup time in a flow shop
    Lu, D.
    Logendran, R.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2013, 64 (04) : 530 - 546
  • [43] Modeling a Flexible Flow Shop Scheduling Problem without Unemployment by Considering Sequence-Dependent Preparation Times and Solving it with a Meta-Heuristic Algorithm
    Kurniady, Dedy Achmad
    Denih, Asep
    Rijanto, Tri
    Artemova, Elena Igorevna
    Hoi, Huynh Tan
    Liu Zhaojun
    Nuryani, Lilis Holisoh
    Komariah, Aan
    Vagabov, Mahach
    INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2022, 21 (02): : 291 - 302
  • [44] Two-stage no-wait hybrid flow-shop scheduling with sequence-dependent setup times
    Wang, Shijin
    Wang, Xiaodong
    Yu, Li
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE-OPERATIONS & LOGISTICS, 2020, 7 (03) : 291 - 307
  • [45] A metaheuristic algorithm co-driven by Q-learning and a learning mechanism for the distributed blocking flowshop scheduling problem with preventive maintenance and sequence-dependent setup times
    Sun, Congcong
    Sang, Hongyan
    Yuan, Li
    Gong, Jinfeng
    Zhu, Hongmin
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2025,
  • [46] An efficient simulation–neural network–genetic algorithm for flexible flow shops with sequence-dependent setup times, job deterioration and learning effects
    A. Azadeh
    A. Hasani Goodarzi
    M. Hasannia Kolaee
    S. Jebreili
    Neural Computing and Applications, 2019, 31 : 5327 - 5341
  • [47] A Hybrid Genetic Algorithm for Flexible Job Shop Scheduling Problem With Sequence-Dependent Setup Times and Job Lag Times
    Wang, Yilun
    Zhu, Qianwen
    IEEE ACCESS, 2021, 9 : 104864 - 104873
  • [48] A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times
    H. S. Mirsanei
    M. Zandieh
    M. J. Moayed
    M. R. Khabbazi
    Journal of Intelligent Manufacturing, 2011, 22 : 965 - 978
  • [49] A Matheuristic Approach to the Open Shop Scheduling Problem with Sequence-Dependent Setup Times
    Pastore, Erica
    Alfieri, Arianna
    Castiglione, Claudio
    Nicosia, Gaia
    Salassa, Fabio
    IFAC PAPERSONLINE, 2022, 55 (10): : 2167 - 2172
  • [50] Solution methods for scheduling problems with sequence-dependent deterioration and maintenance events
    Delorme, Maxence
    Iori, Manuel
    Mendes, Nilson F. M.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 295 (03) : 823 - 837