Predicting labour productivity for formwork activities in high-rise building construction: a case study

被引:0
作者
Bhilwade V. [1 ]
Delhi V.S.K. [1 ]
Nanthagopalan P. [1 ]
Das A.K. [1 ]
Modi K. [2 ]
机构
[1] Department of Civil Engineering, IIT, Mumbai
[2] Ashoka Buildcon Limited, Nashik
关键词
Artificial neural network; Formwork; High-rise building; Labour productivity;
D O I
10.1007/s42107-022-00545-6
中图分类号
学科分类号
摘要
Predicting labour productivity accurately in critical activities like formwork erection would enable management interventions to improve the site situations especially in the context of high-rise building construction. In this study, Artificial Neural Networks (ANNs) were employed to model and predict three categories of formwork erection activities–aluminium formwork, horizontal formwork and vertical formwork. 16 input factors were identified and a total of 19,344 data points from 42 construction sites all over India were used to train and validate the ANN models. The developed models show a high degree of accuracy in predicting the productivity on sites. The models also give major insights into the factors affecting the productivity of formwork related activities. The adverse effects of some factors like the number of workers on the site were also discussed. The study indicates the usefulness of data-driven techniques for prediction of labour productivity of formwork activities on Indian construction sites. © 2022, The Author(s), under exclusive licence to Springer Nature Switzerland AG.
引用
收藏
页码:959 / 968
页数:9
相关论文
共 22 条
[1]  
Al-Sobiei O.S., Arditi D., Polat G., Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network (ANN) and genetic algorithm (GA) techniques, Construction Management and Economics, 23, 4, pp. 423-430, (2005)
[2]  
Babu G.A., Bhukya S.N., Kumar R.S., Feed forward network with back propagation algorithm for detection of breast cancer, In 2013 8Th International Conference on Computer Science & Education, IEEE, pp. 181-185, (2013)
[3]  
Chakraborty J., An unequal process of urbanisation, Economic and Political Weekly, 52, 9, pp. 90-94, (2017)
[4]  
Chandrasekhar S., Sharma A., Urbanization and spatial patterns of internal migration in India, Spatial Demography, Springer International Publishing, 3, 2, pp. 63-89, (2015)
[5]  
Chen J.H., Hsu S.C., Hybrid ANN-CBR model for disputed change orders in construction projects, Automation in Construction, 17, 1, pp. 56-64, (2007)
[6]  
Chin S., Yoon S., Choi C., Cho C., RFID+ 4 D CAD for progress management of structural steel works in high-rise buildings, Journal of Computing in Civil Engineering, 22, 2, pp. 74-89, (2008)
[7]  
Cosmetatos G.P., Eilon S., Effects of productivity definition and measurement on performance evaluation, European Journal of Operational Research, 14, 1, pp. 31-35, (1983)
[8]  
Gilbreth F.B., Bricklaying system, pp. 413-416, (1909)
[9]  
(2011)
[10]  
Hulten C.R., Total factor productivity: A short biography, . in New Developments in Productivity Analysis, pp. 1-54, (2001)