The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time

被引:0
|
作者
Ali Allahverdi
Fawaz S. Al-Anzi
机构
[1] Kuwait University,Department of Industrial and Management Systems Engineering
[2] Kuwait University,Department of Computer Engineering
来源
The International Journal of Advanced Manufacturing Technology | 2008年 / 37卷
关键词
Assembly flowshop; Bicriteria; Makespan; Mean competition time; Heuristic;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, we address the two-stage assembly flowshop scheduling problem with a weighted sum of makespan and mean completion time criteria, known as bicriteria. Since the problem is NP-hard, we propose heuristics to solve the problem. Specifically, we propose three heuristics; simulated annealing (SA), ant colony optimization (ACO), and self-adaptive differential evolution (SDE). We have conducted computational experiments to compare the performance of the proposed heuristics. It is statistically shown that both SA and SDE perform better than ACO. Moreover, the experiments reveal that SA, in general, performs better than SDE, while SA consumes less CPU time than both SDE and ACO. Therefore, SA is shown to be the best heuristic for the problem.
引用
收藏
页码:166 / 177
页数:11
相关论文
共 50 条
  • [41] The optimal number of used machines in a two-stage flexible flowshop scheduling problem
    Enrique Gerstl
    Gur Mosheiov
    Journal of Scheduling, 2014, 17 : 199 - 210
  • [42] A two-machine flowshop makespan scheduling problem with deteriorating jobs
    Lee, Wen-Chiung
    Wu, Chin-Chia
    Wen, Chien-Chih
    Chung, Yu-Hsiang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 54 (04) : 737 - 749
  • [43] Makespan minimization in the two-machine flowshop batch scheduling problem
    Cheng, TCE
    Lin, BMT
    Toker, A
    NAVAL RESEARCH LOGISTICS, 2000, 47 (02) : 128 - 144
  • [44] Minimizing the number of tardy jobs on a two-stage assembly flowshop
    Allahverdi, Ali
    Aydilek, Asiye
    Aydilek, Harun
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2016, 33 (06) : 391 - 403
  • [45] An FPTAS for the parallel two-stage flowshop problem
    Dong, Jianming
    Tong, Weitian
    Luo, Taibo
    Wang, Xueshi
    Hu, Jueliang
    Xu, Yinfeng
    Lin, Guohui
    THEORETICAL COMPUTER SCIENCE, 2017, 657 : 64 - 72
  • [46] Real-time scheduling for two-stage assembly flowshop with dynamic job arrivals by deep reinforcement learning
    Chen, Jian
    Zhang, Hanlei
    Ma, Wenjing
    Xu, Gangyan
    ADVANCED ENGINEERING INFORMATICS, 2024, 62
  • [47] Comments on "A bicriteria flowshop scheduling problem with setup times''
    Xu, Dehua
    Yin, Yunqiang
    APPLIED MATHEMATICS AND COMPUTATION, 2011, 217 (17) : 7361 - 7364
  • [48] Approximation algorithms for bicriteria scheduling problems on identical parallel machines for makespan and total completion time
    Jiang, Xiaojuan
    Lee, Kangbok
    Pinedo, Michael L.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 305 (02) : 594 - 607
  • [49] Scheduling a two-stage assembly problem with separated setup time to minimise total tardiness
    Luo, JianChao
    Liu, ZhiQiang
    Fan, JiaLi
    Wang, Jun-Qiang
    Feng, YanXiang
    Xu, Jun
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024,
  • [50] Bicriteria scheduling in a two-machine permutation flowshop
    Lin, BMT
    Wu, JM
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (12) : 2299 - 2312