The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time

被引:0
|
作者
Ali Allahverdi
Fawaz S. Al-Anzi
机构
[1] Kuwait University,Department of Industrial and Management Systems Engineering
[2] Kuwait University,Department of Computer Engineering
来源
The International Journal of Advanced Manufacturing Technology | 2008年 / 37卷
关键词
Assembly flowshop; Bicriteria; Makespan; Mean competition time; Heuristic;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, we address the two-stage assembly flowshop scheduling problem with a weighted sum of makespan and mean completion time criteria, known as bicriteria. Since the problem is NP-hard, we propose heuristics to solve the problem. Specifically, we propose three heuristics; simulated annealing (SA), ant colony optimization (ACO), and self-adaptive differential evolution (SDE). We have conducted computational experiments to compare the performance of the proposed heuristics. It is statistically shown that both SA and SDE perform better than ACO. Moreover, the experiments reveal that SA, in general, performs better than SDE, while SA consumes less CPU time than both SDE and ACO. Therefore, SA is shown to be the best heuristic for the problem.
引用
收藏
页码:166 / 177
页数:11
相关论文
共 50 条