Resource-constraint Multi-project Scheduling with Priorities and Uncertain Activity Durations

被引:0
作者
Zheng Zheng
Lin Shumin
Guo Ze
Zhu Yueni
机构
[1] Science and Technology on Aircraft Control Laboratory,School of Automation Science and Electrical Engineering
[2] Beihang University,undefined
来源
International Journal of Computational Intelligence Systems | 2013年 / 6卷
关键词
Multi-Project Scheduling; Priorities; Robustness; Uncertain Activity Durations; Uncertainty;
D O I
暂无
中图分类号
学科分类号
摘要
Resource-constraint multi-project scheduling is one of the most important topic in the field of project management. Most current works solve this problem based on an idea that multiple projects can be simply emerged into a super-project in a deterministic environment, regardless of the project priority and robustness of schedules. This paper discusses the RCMPSP with priority and formulates a discrete bi-objective decision model. A modified NSGA-II based algorithm is presented to solve the model. Furthermore, we design systematic experiments to investigate the interrelationship between robustness and its related project parameters, including order strength, resource constrainedness and uncertainty level. The results demonstrate the effectiveness of the solution algorithm and show that the three parameters indeed have evident impacts on the robustness and makespan of projects.
引用
收藏
页码:530 / 547
页数:17
相关论文
共 48 条
[1]  
Payne JH(1995)Management of multiple simultaneous projects: a state-of-the- art review International Journal of Project Management 13 163-168
[2]  
Kim KW(2005)Hybrid genetic algorithm with adaptive abilities for resource-constrained multiple project scheduling Computers in Industry 56 143-160
[3]  
Yun YS(2008)A genetic algorithm for the resource constrained multi-project scheduling problem European Journal of Operational Research 189 1171-1190
[4]  
Yoon JM(2001)Analysis of scheduling schemes and heuristic rules performance in resource-constrained multi-project scheduling Annals of Operations Research 102 263-286
[5]  
Gen M(2000)A multi-criteria heuristic method to improve resource allocation in multi-project scheduling European Journal of Operational Research 127 408-424
[6]  
Yamazaki G(2011)An artificial immune algorithm for the project scheduling problem under resource constraints Applied Soft Computing Journal 11 1975-1982
[7]  
Goncalves JF(2011)On the performance of bee algorithms for resource-constrained project scheduling problem Applied Soft Computing Journal 11 3720-3733
[8]  
Mendes JJM(2012)R.J.J.M The effects of Project Management Information Systems on decision making in a multi project environment 30 162-175
[9]  
Resende MGC(2009)A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times European Journal of Operational Research 197 492-508
[10]  
Lova A(2007)A hierarchical approach to multi-project planning under uncertainty Omega 35 563-577