Tunneling-induced deep-seated landslides: a case study in Gulin County, Sichuan, China

被引:0
作者
Zhong Fu Wang
Feng Ge Shi
Dong Dong Li
Haoyuan Li
机构
[1] North China University of Water Resources and Electric Power,
[2] Henan Key Laboratory of Geotechnical and Structure Engineering,undefined
[3] Collaborative Innovation Center of Water Resources Efficient Utilization and Support Engineering of Henan Province,undefined
来源
Arabian Journal of Geosciences | 2020年 / 13卷
关键词
Highway tunnel; Ancient landslide; Engineering geological analysis; Stability evaluation; Numerical analysis;
D O I
暂无
中图分类号
学科分类号
摘要
The excavation of a highway tunnel revived an ancient landslide in Gulin County, Sichuan Province, China, which resulted in many severe problems such as ground surface cracks, tunnel deformation, and supporting structure damage. This paper focused on the interaction between the old landslide and the tunnel. First, the engineering geological conditions and deformation characteristics of the ancient landslide were determined on the base of field geological survey and geological prospecting. Second, the calculation parameters of the sliding body and sliding zone were obtained by back analysis to the surface deformation monitoring data. Finally, the failure mechanism of landslide due to tunnel excavation was discussed by three-dimensional numerical simulation, and the effect of proposed reinforcement measures was evaluated. The investigation results show that the ancient landslide consists mainly of gravel and block stones, and the major reason for the landslide failure is that the tunnel is exactly across the ancient landslide belt. The sliding surface below the left tunnel is gentle, and the thick sliding body prevents the upper body from sliding largely. Therefore, the deformation of the sliding body mainly occurred in the region above the tunnel. The calculated overall deformation range and value for the sliding body by back analysis are in good agreement with the field survey results and slope deformation monitoring data. According to the tunnel construction period and deformation characteristics of the sliding body, it is suggested to remove some part of the sliding body above the tunnel. The numerical simulation results show that, after removal, the sliding body and tunnel are small in deformation and are stable. The research results in this paper not only keep the tunnel under good construction and operation but also ensure the people and their property, which saves much construction cost and provide a valuable reference to similar projects.
引用
收藏
相关论文
共 70 条
[1]  
Bandini A(2015)Tunnelling-induced landslides: The Val di Sambro tunnel case study Eng Geol 196 71-87
[2]  
Berry P(2015)Interaction between tunnel and unstable slope—influence of time-dependent behavior of a tunnel excavation in a deep-seated gravitational slope deformation Tunn Undergr Space Technol 50 270-281
[3]  
Boldini D(2018)Simulating the failure process of the Xinmo landslide using discontinuous deformation analysis Eng Geol 239 269-281
[4]  
Causse L(2013)Stability assessment of an ancient landslide crossed by two coal mine tunnels Eng Geol 159 36-44
[5]  
Cojean R(2009)Application of spatial prediction techniques to defining three-dimensional landslide shear surface geometry Landslides 6 321-333
[6]  
Fleurisson J-A(2015)Understanding the mechanism of slope failure on a nearby highway tunnel route by different slope stability analysis methods: a case from NE Turkey Bull Eng Geol Environ 75 945-958
[7]  
Chen K-T(2005)An example of landslide-inflicted damage to tunnel in the 2004 Mid-Niigata Prefecture earthquake Landslides 2 159-163
[8]  
Wu J-H(2009)Numerical analysis of slope stability based on the gravity increase method Comput Geotech 36 1246-1258
[9]  
Jiao Y-Y(2005)From the geological to the numerical model in the analysis of gravity-induced slope deformations: an example from the Central Apennines (Italy) Eng Geol 78 215-236
[10]  
Wang Z-H(2012)Monitoring, numerical modelling and hazard mitigation of the Moscardo landslide (Eastern Italian Alps) Eng Geol 128 95-107