共 21 条
[1]
Aissi H., Aloulou M.A., Kovalyov M.Y., Minimizing the number of late jobs on a single machine under due date uncertainty, J. Sched., 14, pp. 351-360, (2011)
[2]
Chand S., Chhajed D., A single machine model for determination of optimal due dates and sequence, Oper. Res., 40, pp. 596-602, (1992)
[3]
Choi B.C., Lee K., Leung J.Y.T., Pinedo M.L., Flow shops with machine maintenance: Ordered and proportionate cases, Eur. J. Oper. Res., 207, pp. 97-104, (2010)
[4]
Condotta A., Knust S., Shakhlevich N.V., Parallel batch scheduling of equal-length jobs with release and due dates, J. Sched., 13, pp. 463-477, (2010)
[5]
Hardy G.H., Littlewood J.E., Polya G., Inequalities, (1967)
[6]
Hsu C.J., Yang S.J., Yang D.L., Two due date assignment problems with position-dependent processing time on a single-machine, Comput. Ind. Eng., 60, pp. 796-800, (2011)
[7]
Koulamas C., Kyparisis G.J., Single-machine scheduling with waiting-time-dependent due dates, Eur. J. Oper. Res., 191, pp. 577-581, (2008)
[8]
Li S.S., Ng C.T., Yuan J.J., Group scheduling and due date assignment on a single machine, Int. J. Prod. Econ., 130, pp. 230-235, (2011)
[9]
Low C.Y., Ji M., Hsu C.J., Su C.T., Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance, Appl. Math. Model., 34, pp. 334-342, (2010)
[10]
Mosheiov G., Oron D., Due-date assignment and maintenance activity scheduling problem, Math. Comput. Model., 44, pp. 1053-1057, (2006)