共 22 条
[1]
Lee C. H.(1998)Cyclic seismic testing of full-scale column-tree type steel moment connections Journal of Korean Society of Steel Construction 10 629-639
[2]
Park J. W.(2014)Cyclic testing of steel column-tree moment connections with various beam splice lengths Steel and Composite Structures 16 221-231
[3]
Lee K.(2015)Cyclic testing of weak-axis column-tree connections with formation of plastic hinge at beam splice Earthquakes and Structures 8 1039-1054
[4]
Li R.(2015)Seismic performance evaluation of weak axis column-tree moment connections with reduced beam section Journal of Constructional Steel Research 105 28-38
[5]
Chen L.(2014)Cyclic Testing of Steel Moment Connections with Weakened Beam Splices International Journal of Steel Structures 14 471-478
[6]
Oh K.(undefined)undefined undefined undefined undefined-undefined
[7]
Kim K. S.(undefined)undefined undefined undefined undefined-undefined
[8]
Oh K.(undefined)undefined undefined undefined undefined-undefined
[9]
Chen L.(undefined)undefined undefined undefined undefined-undefined
[10]
Hong S. B.(undefined)undefined undefined undefined undefined-undefined