共 93 条
[1]
Abdul-Aziz A., Control mechanisms exercised in Malaysian housing public–private partnerships, Construction Management and Economics, 30, 1, pp. 37-55, (2012)
[2]
Ahmed R., Philbin S.P., Cheema F.-E., Systematic literature review of project manager’s leadership competencies, Engineering, Construction and Architectural Management, 28, 1, pp. 1-30, (2021)
[3]
Akal A.Y., Abu El-Maaty A.E., El-Hamrawy S.A., A circular framework for evaluating highway construction projects success: AHP approach, Civil Engineering Journal, 2, 7, pp. 324-333, (2016)
[4]
Albtoush A.M., Doh S.I., Rahman R.A., Al-Momani A.H., Critical success factors of construction projects in Jordan: an empirical investigation, Asian Journal of Civil Engineering, 23, pp. 1087-1099, (2022)
[5]
Ali A., Wang H., Soomro M.A., Islam T., Shared leadership and team creativity: construction industry perspective, Journal of Construction Engineering and Management, 146, 10, (2020)
[6]
Altarawneh J.Y., Samadi B., The relationship between critical success factors and success criteria in construction projects in the United Arab Emirates, International Journal of Advanced and Applied Sciences, 6, 7, pp. 43-53, (2019)
[7]
Amberg M., Fischl F., Wiener M., Background of critical success factors research. Friedrich-alexander-universitat Erlan-gen-Nurnberg working, paper no. 2/2005, (2005)
[8]
Arantes A., Ferreira L.M.D.F., Underlying causes and mitigation measures of delays in construction projects: an empirical study, Journal of Financial Management of Property and Construction, 25, 2, pp. 165-181, (2020)
[9]
Azis A.A.A., Memon A.H., Rahman I.A., Latif Q.B.A.I., Nagapan S., Cost management of large construction projects in south Malaysia, IEEE Symposium on Business Engineering and Industrial Application, (2012)
[10]
Bentler P.M., Comparative fit indices in structural models, Psychological Bulletin, 107, 2, pp. 238-246, (1990)