共 27 条
[1]
Brucker P., Drexl A., Mohring R., Neumann K., Pesch E., Resource-constrained project scheduling: Notation, classification, models and methods, Eur J Oper Res, 112, pp. 3-41, (1999)
[2]
Buss A.H., Rosenblatt M.J., Activity delay in stochastic project networks Operations Research, 45, pp. 126-139, (1997)
[3]
Charnes A., Cooper W.W., Thompson G.L., Critical path analysis via chance-constrained and stochastic programming, Oper Res, 12, pp. 460-470, (1964)
[4]
Demeulemeester E., Herroelen W., Van Dommelen P., An optimal recursive search procedure for the deterministic uncostrained max-npv project scheduling problem, Reseach Report 9603 Department of Applied Economics, (1996)
[5]
Dodin B., Bounding the project completion time distribution in PERT network, Oper Res, 33, pp. 862-865, (1985)
[6]
Doersch R.H., Patterson J.H., Scheduling a project to maximize its present value: A zero-one programming approach, Manage Sci, 23, pp. 882-889, (1977)
[7]
Elmaghraby S.E., On the expected duration time of PERT network, Manage Sci, 13, pp. 299-306, (1967)
[8]
Elmaghraby S.E., Herroelen W.S., The scheduling of activities to maximize the net present value of projects, Eur J Oper Res, 49, pp. 35-49, (1990)
[9]
Fulkerson D.R., Expected critical path lenghts in PERT networks, Oper Res, 10, pp. 808-817, (1962)
[10]
Gaul W., On stochastic analysis of project-networks, Deterministic and Stochastic Scheduling, pp. 297-309, (1982)