共 97 条
[31]
Shabtay D(2012b)Single-machine scheduling with nonlinear deterioration Optim. Lett. 6 87-98
[32]
Kaspi M.(2010)Single-machine scheduling with learning effect and resource-dependent processing times Comput. Indus. Eng. 59 458-462
[33]
Shabtay D.(2007)Single machine scheduling problems with controllable processing times and total absolute differences penalties Eur. J. Oper. Res. 177 638-645
[34]
Koulamas C(2012)Single-machine scheduling with time-and-resource-dependent processing times Appl. Math. Modell. 62 792-798
[35]
Gupta S(2011)Group scheduling problems with simultaneous considerations of learning and deterioration effects on a single-machine Appl. Math. Modell. 35 4008-4016
[36]
Kyparisis GJ(2010)Single-machine group scheduling problems under the effects of deterioration and learning Comput. Indus. Eng. 58 754-758
[37]
Lee W-C(2011)Single-machine scheduling simultaneous with position-based and sum-of-processing-times-based learning considerations under group technology assumption Appl. Math. Modell. 35 2068-2074
[38]
Wu C-C(2010)Single-machine group scheduling problems with deteriorated and learning effect Appl. Math. Comput. 216 1259-1266
[39]
Lee W-C(2011)Single-machine group scheduling with resource allocation and learning effect Comput. Indus. Eng. 60 148-157
[40]
Wu C-C(undefined)undefined undefined undefined undefined-undefined