共 125 条
[71]
Kobayashi S., Ono I., Yammamura M., An efficient genetic algorithm for job shop scheduling problems, ICGA, pp. 506-511, (1995)
[72]
Kolisch R., Sprecher A., Psplib - A project scheduling problem library, Eurpoean Journal of Operations Research, 96, 1, pp. 205-216, (1996)
[73]
Langdon W., Scheduling maintenance of electrical power transmission networks using genetic programming, Artificial Intelligence Techniques in Power Systems, pp. 220-237, (1997)
[74]
Langdon W., Scheduling planned maintenance of the south wales region of the national grid, Lecture Notes in Computer Science, 1305, pp. 181-197, (1997)
[75]
Langdon W.B., Cantu-Paz E., Mathias K., Roy R., Davis D., Poli R., Balakrishnan K., Honavar V., Rudolph G., Wegener J., Bull L., Potter M.A., Schultz A.C., Miller J.F., Burke E., Jonoska N., GECCO 2002: Proceedings of the Genetic and Evolutionary Computation Conference, (2002)
[76]
Lin S.-C., Goodman E., Punch W., Investigating parallel genetic algorithms on job shop scheduling problems, Lecture Notes in Computer Science, 1213, pp. 383-393, (1997)
[77]
Lin S.-C., Goodman E.D., Punch W.F., A genetic algorithm approach to dynamic job-shop scheduling problems, Proceedings of the Seventh International Conference on Genetic Algorithms, pp. 481-489, (1997)
[78]
Matsui S., Watanabe I., Tokoro K., Real-coded parameter-free genetic algorithms for job-shop scheduling, Parallel Problem Solving from Nature - PPSN VII, pp. 801-810, (2002)
[79]
Mattfield D.C., Evolutionary Search and the Job-shop, (1996)
[80]
Merkle D., Middendorf M., An ant algorithm with a new pheromone evaluation rule for total tardiness problems, Applications of Evolutionary Computing, EvoWorkshops (2000), pp. 287-296, (2000)