共 11 条
[1]
Adams J., Balas E., Zawack D., The shifting bottleneck procedure for job-shop scheduling, Management Science, 34, pp. 391-401, (1988)
[2]
Brucker P., Kramer A., Shop scheduling problems with multiprocessor tasks on dedicated processors, Annals of Operations Research, 57, pp. 13-27, (1995)
[3]
Brucker P., Schlie R., Job-shop scheduling with multi-purpose machines, Computing, 45, pp. 369-375, (1990)
[4]
Dauzere-Peres S., Paulli J., A Global Tabu Search Procedure for the General Multiprocessor Job-shop Scheduling Problem., (1995)
[5]
Fisher H., Thompson G.L., Probabilistic Learning Combinations of Local Job-shop Scheduling Rules., pp. 225-251, (1963)
[6]
Hurink J., Jurisch B., Thole M., Tabu Search for the Jobshop Scheduling Problem with Multi-purpose Machines., OR-Spektrum, 15, pp. 205-215, (1994)
[7]
Jurisch B., Scheduling Jobs in Shops with Multi-purpose Machines., (1992)
[8]
Kramer A., Scheduling Multiprocessor Tasks on Dedicated Processors., (1995)
[9]
Roy B., Sussmann B., Les Problèmes D'ordonnancement Avec Constraintes Disjunctives., (1964)
[10]
Sprecher A., Drexl A., Solving multi-mode resource-constrained project scheduling problems by a simple, general and powerful sequencing algorithm. Part I: Theory, Manuskripte Aus Den Instituten für Betriebswirtschaftslehre der Universität Kiel, 385, (1996)