Practice for Extending Blast Furnace Campaign Life at Wuhan Iron and Steel Corporation

被引:0
|
作者
Shou-rong Zhang
机构
[1] Wuhan Iron and Steel Corporation,
来源
Journal of Iron and Steel Research International | 2006年 / 13卷
关键词
blast furnace; campaign life; erosion;
D O I
暂无
中图分类号
学科分类号
摘要
One of the problems encountered in 60’s to 80’s of 20th century in China’s steel industry was short life of blast furnace shaft as well as the excessive erosion of blast furnace hearth. A series of research work was carried out in order to extend blast furnace campaign life. The concept of research and development was integrated in the construction of BF (blast furnace) No. 5 at WISCO (Wuhan Iron and Steel Corporation), and in October, 1991, the BF No. 5 was blown in. The blast furnace has worked smoothly for more than 15 years without any medium repair even guniting. It is expected that the campaign life of BF No. 5 would be longer than 16 years with a production over 11 000 t per unit inner volume (m3 ). A new blast furnace with an inner volume of 3 400 m3 is under construction, and is designed with a campaign life of 20 years without any medium repair. The campaign life of blast furnaces in China has been extended in recent years.
引用
收藏
页码:1 / 7
页数:6
相关论文
共 23 条
  • [1] Practice for Extending Blast Furnace Campaign Life at Wuhan Iron and Steel Corporation
    ZHANG Shou-rong (Wuhan Iron and Steel Corporation
    Journal of Iron and Steel Research(International), 2006, (06) : 1 - 7
  • [2] Practice for extending blast furnace campaign life at Wuhan Iron and Steel Corporation
    Zhang Shou-rong
    JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL, 2006, 13 (06) : 1 - +
  • [3] Experience for prolongation of blast furnace campaign life at Wuhan Iron and Steel Corporation
    Zhang, SR
    61ST IRONMAKING CONFERENCE PROCEEDINGS, 2002, 61 : 105 - 120
  • [4] Practice and Concept for Extending Blast Furnace Campaign Life at WISCO
    Zhang Shou-rong
    Yu Zhong-jie
    JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL, 2009, 16 : 830 - 835
  • [5] Extending the Campaign Life of an Intensively Operating Blast Furnace
    Filatov, S. V.
    Kurunov, I. F.
    Gordon, Ya. M.
    Tikhonov, D. N.
    Grachev, S. N.
    METALLURGIST, 2017, 60 (9-10) : 905 - 911
  • [6] Extending the Campaign Life of an Intensively Operating Blast Furnace
    S. V. Filatov
    I. F. Kurunov
    Ya. M. Gordon
    D. N. Tikhonov
    S. N. Grachev
    Metallurgist, 2017, 60 : 905 - 911
  • [7] Methods of extending the campaign of a blast furnace
    I. F. Kurunov
    V. N. Loginov
    D. N. Tikhonov
    Metallurgist, 2007, 51 : 7 - 15
  • [8] Methods of extending a blast-furnace campaign
    Kurunov, I. F.
    Loginov, V. N.
    Tikhonov, D. N.
    METALLURGIST, 2006, 50 (11-12) : 605 - 613
  • [9] Methods of extending a blast-furnace campaign
    I. F. Kurunov
    V. N. Loginov
    D. N. Tikhonov
    Metallurgist, 2006, 50 : 605 - 613
  • [10] EXTENDING THE LIFE OF BLAST-FURNACE AIR TUYERES
    Zainullin, L. A.
    Epishin, A. Yu
    Spirin, N. A.
    METALLURGIST, 2018, 62 (3-4) : 322 - 325