共 31 条
- [1] Wu C.H., Hsieh T.Y., Cheng W.L., Lu S.T., Grey relation analysis of causes for change orders in highway construction, Constr Manage Econ., 22, 5, pp. 509-520, (2004)
- [2] Sun M., Meng X., Taxonomy for change causes and effects in construction projects, Int J Proj Manage, 27, pp. 560-572, (2009)
- [3] Chua D.K.H., Hossain M.A., Predicting change propagation and impact on design schedule due to external changes, IEEE Trans Eng Manage., 59, pp. 483-493, (2012)
- [4] Rachid Z., Toufik B., Mohammed B., Causes of schedule delays in construction projects in Algeria, Int J Constr Manage, 19, pp. 371-381, (2019)
- [5] Yap J.B.H., Skitmore M., Gray J., Shavarebi K., Systemic View to Understanding Design Change Causation and Exploitation of Communications and Knowledge, Proj Manage J, 50, pp. 288-305, (2019)
- [6] Padala S.P.S., Maheswari J.U., Hirani H., Identification and classification of changes causes and effects in construction projects, Int Constr Manage, (2020)
- [7] Sanni-Anibire M.O., Mohamad Z.R., Olatunji S.O., Causes of delay in the global construction industry: A Meta Analytical Review, Int Constr Manage, pp. 1-13, (2020)
- [8] Mittal Y.K., Paul V.K., Sawhney A., Methodology for Estimating the Cost of Delay in Architectural Engineering Projects: Case of Metro Rails in India, J. Inst. Eng. India Ser. A, 100, pp. 311-318, (2019)
- [9] Singh M., Sarkar D., Vara D., Comparative Study of Risk Indices for Infrastructure Transportation Project Using Different Methods, J. Inst. Eng. India Ser. A, 100, pp. 275-286, (2019)
- [10] Elkalla I., Elbeltagi E., El Shikh M., Solving Fuzzy Time-Cost Trade-Off in Construction Projects Using Linear Programming, J. Inst. Eng. India Ser. A, (2020)