共 42 条
[1]
Elmaghraby SE(1990)Project bidding under deterministic and probabilistic activity durations European Journal of Operational Research 49 14-34
[2]
Fulkerson DR(1961)A network flow computation for project cost curves Management Science 7 167-179
[3]
Gutierrez G(2000)Analysis of the effects of uncertainty, risk-pooling, and subcontracting mechanisms on project performance Operations Research 48 927-938
[4]
Paul A(1961)Critical path planning and scheduling: Mathematical basis Operations Research 9 296-320
[5]
Kelley JE(2010)Optimal time-based and cost-based coordinated project contracts with unobservable work rates International Journal of Production Economics 126 247-254
[6]
Kwon HD(2009)Foundation of credibilistic logic Fuzzy Optimization and Decision Making 8 91-102
[7]
Lippman HD(2009)Hybrid logic and uncertain logic Journal of Uncertain Systems 3 83-94
[8]
Tang CS(2011)Uncertain logic for modeling human language Journal of Uncertain Systems 5 3-20
[9]
Li X(2013)Polyrectangular theorem and independence of uncertain vectors Journal of Uncertainty Analysis and Applications 1 9-634
[10]
Liu B(2013)Uncertain random variables: A mixture of uncertainty and randomness Soft Computing 17 625-39