The impact of decision criteria on deadline-based incentive contracts in project management

被引:0
作者
Jiao Wang
Kai Yang
Ruiqing Zhao
机构
[1] Tianjin University,Institute of Systems Engineering
来源
Journal of Intelligent Manufacturing | 2017年 / 28卷
关键词
Uncertainty theory; Project management; Incentive contract; Asymmetric information; Decision criterion;
D O I
暂无
中图分类号
学科分类号
摘要
This paper investigates the impact of decision criteria on incentives in a project management setting, where a project manager operates a project consisting of two tasks performed sequentially by two different subcontractors. The completion time is characterized as an uncertain variable, which depends on the subcontractor’s unobservable effort of each task. Within the framework of uncertainty theory, four classes of uncertain principal agent models are presented under the expected value criterion and the critical value criterion. According to the structural characteristics, each model can be decomposed into two equivalent sub-models, which can be solved to obtain the optimal deadline-based incentive contracts via a two-step optimization method. Further, the interconnections among these contracts are discussed. It’s demonstrated that the optimal deadline-based incentive contract depends on the confidence level of the party (either the project manager or the subcontractor) who adopts the critical value criterion. Meanwhile, the more conservative the subcontractor is, the higher the incentive coefficients will be. And the more conservative the project manager is, the lower the incentive coefficients will be. Finally, given some special confidence levels, it’s interesting to find that the four models can be equivalent.
引用
收藏
页码:643 / 655
页数:12
相关论文
共 42 条
[1]  
Elmaghraby SE(1990)Project bidding under deterministic and probabilistic activity durations European Journal of Operational Research 49 14-34
[2]  
Fulkerson DR(1961)A network flow computation for project cost curves Management Science 7 167-179
[3]  
Gutierrez G(2000)Analysis of the effects of uncertainty, risk-pooling, and subcontracting mechanisms on project performance Operations Research 48 927-938
[4]  
Paul A(1961)Critical path planning and scheduling: Mathematical basis Operations Research 9 296-320
[5]  
Kelley JE(2010)Optimal time-based and cost-based coordinated project contracts with unobservable work rates International Journal of Production Economics 126 247-254
[6]  
Kwon HD(2009)Foundation of credibilistic logic Fuzzy Optimization and Decision Making 8 91-102
[7]  
Lippman HD(2009)Hybrid logic and uncertain logic Journal of Uncertain Systems 3 83-94
[8]  
Tang CS(2011)Uncertain logic for modeling human language Journal of Uncertain Systems 5 3-20
[9]  
Li X(2013)Polyrectangular theorem and independence of uncertain vectors Journal of Uncertainty Analysis and Applications 1 9-634
[10]  
Liu B(2013)Uncertain random variables: A mixture of uncertainty and randomness Soft Computing 17 625-39