共 20 条
- [7] Design optimization on structure of blowdown in CPR1000 steam generator Wang, G., 1600, Atomic Energy Press (35): : 64 - 68
- [9] Redistribution of stresses in the header–PGV-1000 steam generator connector weldment under loading after thermal treatment Strength of Materials, 2009, 41 : 251 - 256