共 50 条
- [31] Optimum length of single-lane closures in work zones on rural four-lane freeways 1998 TRB DISTINGUISHED LECTURE, PT 1/MAINTENANCE CHALLENGES AND SAFETY ISSUES, PT 2, 1998, (1650): : 55 - 61
- [32] Delay estimation and optimal length for four-lane divided freeway workzones JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 1996, 122 (02): : 114 - 122
- [33] Traffic Characteristics and Capacity of Overtaking Lane Partly Occupied Traffic Control Zone of Four-lane Freeway Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2020, 20 (02): : 218 - 224
- [34] Construction Mechanics and Safety Analysis of "Backfill-Bench Method" for In-situ Expansion of Four-lane Highway Tunnel in Collapsed Section Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2021, 34 (06): : 109 - 124
- [36] Relationship between speed distribution and horizontal alignment on rural four-lane highways TRAFFIC AND TRANSPORTATION STUDIES, VOLS 1 AND 2, PROCEEDINGS, 2002, : 1116 - 1123
- [39] Construction process of four-lane section road tunnel by finite element method Electronic Journal of Geotechnical Engineering, 2014, 19 S : 4593 - 4602