共 59 条
- [1] Agha MH(2010)Integrated production and utility system approach for optimizing industrial unit operations Energy 35 611-627
- [2] Thery R(1993)The project scheduling polyhedron: dimension, facets and lifting theorems" Eur J Oper Res 67 204-220
- [3] Hetreux G(1991)A computational study of job-shop scheduling ORSA J Comput 3 149-156
- [4] Haït A(2003)Insertion techniques for static and dynamic resource-constrained project scheduling" Eur J Oper Res 149 249-267
- [5] Le Lann J-M(2000)Constraint propagation and decomposition techniques for highly disjunctive and highly cumulative project scheduling problems" Constraints 5 119-139
- [6] Alvarez-Valdès R(1983)Scheduling subject to resource constraints: Classification and complexity" Discrete Applied Mathematics 5 11-24
- [7] Tamarit JM(1959)The schedule-sequencing problem Operations Research 7 621-624
- [8] Applegate D(2003)On linear lower bounds for resource constrained project scheduling problem" Eur J Oper Res 149 314-324
- [9] Cook W(2009)The project scheduling problem with production and consumption of resources: A list-scheduling based algorithm" Discrete Applied Mathematics 157 3631-3642
- [10] Artigues C(2006)An efficient MILP model for the short-term scheduling of single stage batch plants Computers and Chemical Engineering 30 1003-1018