Solving Fuzzy Time–Cost Trade-Off in Construction Projects Using Linear Programming

被引:3
作者
Elkalla I. [1 ]
Elbeltagi E. [1 ]
El Shikh M. [1 ]
机构
[1] Structural Engineering Department, Faculty of Engineering, Mansoura University, Mansoura
关键词
Fuzzy time–cost trade-off; Linear programming; Nearest symmetric trapezoidal fuzzy number; Simplex method;
D O I
10.1007/s40030-020-00489-7
中图分类号
学科分类号
摘要
The time–cost trade-off has been recognized as a very significant aspect of construction management. Generally, time–cost trade-off can be modeled as a fuzzy linear programming problem with symmetric or non-symmetric fuzzy numbers. However, it was successfully solved when the fuzzy membership functions are only symmetric. In the present work, a novel approach is introduced to solve fuzzy linear programming problem with non-symmetric fuzzy membership functions by transforming it to its corresponding nearest symmetric one. The transformed problem is then converted to its crisp linear programming problem and then solved by the standard primal simplex method. Two examples are presented to show the effectiveness of the proposed approach, and the results are discussed. © 2020, The Institution of Engineers (India).
引用
收藏
页码:267 / 278
页数:11
相关论文
共 50 条
  • [31] Assessing the seasonal influence on the quality of seawater using fuzzy linear programming
    Riverol, C.
    Pilipovik, M. V.
    DESALINATION, 2008, 230 (1-3) : 175 - 182
  • [32] OPTIMIZING THE PRESSURIZED IRRIGATION NETWORKS USING FUZZY LINEAR AND DYNAMIC PROGRAMMING
    Chondrogiannis, S.
    Tzimopoulos, C.
    Evangelides, C.
    PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND TECHNOLOGY, 2013,
  • [33] Minimum-cost capacitated fuzzy network, fuzzy linear programming formulation, and perspective data analytics to minimize the operations cost of American airlines
    Khan, Izaz Ullah
    Rafique, Faisal
    SOFT COMPUTING, 2021, 25 (02) : 1411 - 1429
  • [34] Commentary on "A reply to a Note on the paper "A simplified novel technique for solving fully fuzzy linear programming problems""
    Kaur, Arshdeep
    Kumar, Amit
    Appadoo, S. S.
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2019, 36 (06) : 5685 - 5691
  • [35] Transportation Cost Minimization of a Manufacturing Firm using Linear Programming Technique
    Edokpia, R. O.
    Ohikhuare, K. O.
    ADVANCES IN MATERIALS AND SYSTEMS TECHNOLOGIES III, 2012, 367 : 685 - 695
  • [36] Cost minimization of nutrient reduction in watershed management using linear programming
    Schleich, J
    White, D
    JOURNAL OF THE AMERICAN WATER RESOURCES ASSOCIATION, 1997, 33 (01): : 135 - 142
  • [37] On-off minimum-time control with limited fuel usage: Near global optima via linear programming
    Driessen, BJ
    OPTIMAL CONTROL APPLICATIONS & METHODS, 2006, 27 (03) : 161 - 168
  • [38] Project Selection with Outsourcing View Using Fuzzy TOPSIS Linear Assignment Programming
    Mahdi, Bashiri
    Hossein, Badri
    2008 IEEE INTERNATIONAL CONFERENCE ON MANAGEMENT OF INNOVATION AND TECHNOLOGY, VOLS 1-3, 2008, : 327 - 332
  • [39] Location selection for waste-to-energy plants by using fuzzy linear programming
    Ilbahar, Esra
    Kahraman, Cengiz
    Cebi, Selcuk
    ENERGY, 2021, 234
  • [40] Cost-time trade off models application to crashing flow shop scheduling problems
    Bagherpour, M
    Noori, S
    Sadjadi, SJ
    COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2006, PT 3, 2006, 3982 : 546 - 553